Difference between revisions of "Oct 18, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Minutes) |
|||
Line 24: | Line 24: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: Elton, Jack, Chris, Nick, Jim, Ivan, Yi |
# Announcements | # Announcements | ||
# Action Items | # Action Items | ||
# Schedule for production and testing (all) | # Schedule for production and testing (all) | ||
− | # | + | ## Schedule for electronics (Chris) |
− | #* Schedule for SiPM assignment and jumper sheets | + | ##* Boards are in fabrication. Parts are ordered. PR for assembly has been awarded. Chris will send around the best estimate for arrival of boards (~mid Nov) |
+ | ##* Two first article boards will arrive first and need to be tested. | ||
+ | ## Schedule for SiPM assignment and jumper sheets (Jack) | ||
+ | ##* Assignment and jumper settings for first article boards to be completed by next week. | ||
+ | ##* Include SiPMs on mini-Bcal into assignment groupings. Eliminate two scratched units. | ||
+ | ## Schedule for mechanical parts (Jim) | ||
+ | ##* All drawings have been signed off | ||
+ | ##* Two PRs should be completed next week (one for laser/water jet cuts and one for mill pieces). Credit card order will be placed for the steel die | ||
# mini-Bcal (Elton) | # mini-Bcal (Elton) | ||
− | # SiPM production testing (Yi) | + | # SiPM production testing (Yi and Ivan) |
+ | #* Completed 80 SiPM sensors off the mini-Bcal. Units 286 and 1087 from the mini-Bcal were found to have scratches. Tomorrow will retest three units from the downstream row. Next, will test six "untested" SiPMs that were shipped from USM | ||
+ | # Dehumidification of test box | ||
+ | #* A/C unit has been ordered | ||
+ | #* Plan for duct work is ready and parts are off the shelf, which can be purchased when unit arrives. | ||
# Mechanical assembly (Jim) | # Mechanical assembly (Jim) | ||
# Temperature compensation (Jack) | # Temperature compensation (Jack) | ||
+ | #* Assignment and jumpers for first two boards will be done next week. | ||
+ | #* Assignment of all remaining boards will be completed after the IEEE conference, first full week of Nov. | ||
# Electronic boards (Fernando and Chris) | # Electronic boards (Fernando and Chris) | ||
#* U-board puller? | #* U-board puller? | ||
# Light guide gluing setup (Scot)''Attending: | # Light guide gluing setup (Scot)''Attending: |
Revision as of 16:22, 18 October 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
-
Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack) -
Provide feedback to Fernando on his readout assembly schedule (Elton and Jim) - Check uniformity of LED source in black testing box
- Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) In progress
-
Send P6 line numbers (and accounts) to Jim for purchase of the mechanical parts (Elton).
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (all)
- Schedule for production (Fernando and Jim)
- Schedule for SiPM assignment and jumper sheets
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- U-board puller?
- Light guide gluing setup (Scot)
Minutes
Attending: Elton, Jack, Chris, Nick, Jim, Ivan, Yi
- Announcements
- Action Items
- Schedule for production and testing (all)
- Schedule for electronics (Chris)
- Boards are in fabrication. Parts are ordered. PR for assembly has been awarded. Chris will send around the best estimate for arrival of boards (~mid Nov)
- Two first article boards will arrive first and need to be tested.
- Schedule for SiPM assignment and jumper sheets (Jack)
- Assignment and jumper settings for first article boards to be completed by next week.
- Include SiPMs on mini-Bcal into assignment groupings. Eliminate two scratched units.
- Schedule for mechanical parts (Jim)
- All drawings have been signed off
- Two PRs should be completed next week (one for laser/water jet cuts and one for mill pieces). Credit card order will be placed for the steel die
- Schedule for electronics (Chris)
- mini-Bcal (Elton)
- SiPM production testing (Yi and Ivan)
- Completed 80 SiPM sensors off the mini-Bcal. Units 286 and 1087 from the mini-Bcal were found to have scratches. Tomorrow will retest three units from the downstream row. Next, will test six "untested" SiPMs that were shipped from USM
- Dehumidification of test box
- A/C unit has been ordered
- Plan for duct work is ready and parts are off the shelf, which can be purchased when unit arrives.
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Assignment and jumpers for first two boards will be done next week.
- Assignment of all remaining boards will be completed after the IEEE conference, first full week of Nov.
- Electronic boards (Fernando and Chris)
- U-board puller?
- Light guide gluing setup (Scot)Attending: