Difference between revisions of "Oct 28, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Tentative Agenda)
Line 19: Line 19:
 
   
 
   
 
# Calibration
 
# Calibration
## Trapezoidal Lightguide [http://kronos.phys.uregina.ca/~zisis/TrapsGuide_2010-10-15.ppt Traps Guide] (Athens)
 
 
## Calibration/Monitoring page: [[Monitoring R&D]]
 
## Calibration/Monitoring page: [[Monitoring R&D]]
 
# Announcements
 
# Announcements
Line 26: Line 25:
 
# FCAL
 
# FCAL
 
## Construction Status
 
## Construction Status
## CW Base Update [http://dustbunny.physics.indiana.edu/~mashephe/pmt_slides.pdf Slides]
 
 
# BCAL
 
# BCAL
 
## Construction Status
 
## Construction Status
# [[SiPM Radiation Hardness Test | SiPM update]]
 
 
# Simulations
 
# Simulations
 
# Other Updates
 
# Other Updates

Revision as of 14:10, 14 October 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. SiPMs
    • IU: geometry for summed units
    • JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.

Tentative Agenda

  1. Calibration
    1. Calibration/Monitoring page: Monitoring R&D
  2. Announcements
    • Change of meeting time?
  3. Review of Action Items
  4. FCAL
    1. Construction Status
  5. BCAL
    1. Construction Status
  6. Simulations
  7. Other Updates

Minutes

Attendees: