= Minutes =
 
= Minutes =
 +
 +
# Announcements
 +
# Review of Action Items
 +
# [[Detailed plan for testing production SiPM units | Plan for SiPM Testing]] (Carl and Fernando)
 +
# USM report
 +
# Light Guide Geometry
 +
# Light Guide Simulations
 +
# Discussions on MOU with USM

Revision as of 13:51, 7 October 2009

Teleconference Time: 12:15 p.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Ship Baby Bcal to USM.
  2. Make progress on USM MOU document (Elton, Will, Eugene)
  3. Optimization of Bfield direction and magnitude relative to pmt
  4. Light collection efficiencies for light guides for "USM" geometry.

Documents to Review

  1. Media:Draw trigs 38deg.pdf Media:Draw trigs 73deg.pdf for segment #2.
    • Entrance rectangle is 3.01x4.0 cm. Exit radius is 1.35 cm. Length of trapezoid/cone is 60 cm, and length of torus is also 60 cm.
    • This configuration should be comparable to Alam's "cylindrical cone" geometry.
  2. See also Effective diameter vs B field and angle from Antonelli et al., NIMA 368 (1996) 628-634.
  3. Magnetic field plots

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Plan for SiPM Testing (Carl and Fernando)
  4. USM report
  5. Light Guide Geometry
  6. Light Guide Simulations
  7. Discussions on MOU with USM

Minutes

  1. Announcements
  2. Review of Action Items
  3. Plan for SiPM Testing (Carl and Fernando)
  4. USM report
  5. Light Guide Geometry
  6. Light Guide Simulations
  7. Discussions on MOU with USM