Difference between revisions of "Oct 9, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Tentative Agenda)
Line 29: Line 29:
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
# Talks at the [[GlueX-Collaboration-Oct-2012|Collaboration Meeting]]
 
 
# Monitoring
 
# Monitoring
 
# FCAL
 
# FCAL
 
## Construction Status  
 
## Construction Status  
## [[Media:Fcal_darkroom_design.pdf | Darkroom Images]]
 
 
# USM update
 
# USM update
## [[Media:USMReport30.pdf | SiPM Update]] (Javiera)
 
 
# BCAL
 
# BCAL
## SiPM Update (Shaun): Updated slides [[Media:SiPMpresentationV2.pdf]]
 
 
# TDR update
 
# TDR update
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
## See [[Feb 14, 2012 Calorimetry]] Meeting
 
 
# Calibration of Calorimeters
 
# Calibration of Calorimeters
# Simulations/Reconstruction: [https://halldweb1.jlab.org/wiki/images/f/f5/Meet120925.pdf Status of Sample Fraction Study] (Andrei)
 
 
# Any other business
 
# Any other business
  

Revision as of 07:32, 9 October 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Fcal
    • Add beam hole for the ABS upstream cover. (Matt)
    • Feedback to IU on drawings that have been shipped (Tim and Chuck)
  2. SiPMs
  3. Light Guides
    • Send excel sheet with progress information to Elton. (Francisco)

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status
  5. USM update
  6. BCAL
  7. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
  8. Calibration of Calorimeters
  9. Any other business

Minutes

Attendees: