Difference between revisions of "Oct 9, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Items for followup from previous meeting(s))
Line 19: Line 19:
 
# Fcal
 
# Fcal
 
#* Add beam hole for the ABS upstream cover. (Matt)
 
#* Add beam hole for the ABS upstream cover. (Matt)
#* Feedback to IU on drawings that have been shipped (Tim and Chuck)
+
#* <strike> Feedback to IU on drawings that have been shipped (Tim and Chuck) </strike> Section drawings sent
 
# SiPMs
 
# SiPMs
 
#* Update [[SiPM Database#MySQL Database At UTFSM | MySQL Database At UTFSM]]  with detailed description of contents of database entries.
 
#* Update [[SiPM Database#MySQL Database At UTFSM | MySQL Database At UTFSM]]  with detailed description of contents of database entries.
 
# Light Guides
 
# Light Guides
#* Send excel sheet with progress information to Elton. (Francisco)
+
#* <strike> Send excel sheet with progress information to Elton. (Francisco) </strike>
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 07:33, 9 October 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Fcal
    • Add beam hole for the ABS upstream cover. (Matt)
    • Feedback to IU on drawings that have been shipped (Tim and Chuck) Section drawings sent
  2. SiPMs
  3. Light Guides
    • Send excel sheet with progress information to Elton. (Francisco)

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status
  5. USM update
  6. BCAL
  7. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
  8. Calibration of Calorimeters
  9. Any other business

Minutes

Attendees: