Difference between revisions of "October 14, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
Monday October 14, 2019<br>
 
Monday October 14, 2019<br>
 
1:00 pm, EDT<br>
 
1:00 pm, EDT<br>
CC F326 <br>
+
Hall D Counting House <br>
  
 
== Connection Using Bluejeans ==
 
== Connection Using Bluejeans ==
Line 21: Line 21:
 
#** Thermal expansion test #1 [https://logbooks.jlab.org/entry/3734073 Initial setup] [https://logbooks.jlab.org/entry/3734180 Result]
 
#** Thermal expansion test #1 [https://logbooks.jlab.org/entry/3734073 Initial setup] [https://logbooks.jlab.org/entry/3734180 Result]
 
#** Thermal expansion test #2 [https://logbooks.jlab.org/entry/3734181 Initial setup] [https://logbooks.jlab.org/entry/3734270 Result]
 
#** Thermal expansion test #2 [https://logbooks.jlab.org/entry/3734181 Initial setup] [https://logbooks.jlab.org/entry/3734270 Result]
 +
#** Upcoming test #3: 2 new full length pieces with additional glue to ensure adequate seal (this week)
 
#* Mirror cutting at Danny's glass (Tim)
 
#* Mirror cutting at Danny's glass (Tim)
 
#* Borosilicate procurement and delivery (Tim)
 
#* Borosilicate procurement and delivery (Tim)
Line 28: Line 29:
 
#* [https://logbooks.jlab.org/entry/3733993 First tests of North and South OB with pulser and LED] (Justin, Bill)  
 
#* [https://logbooks.jlab.org/entry/3733993 First tests of North and South OB with pulser and LED] (Justin, Bill)  
 
#* [https://logbooks.jlab.org/entry/3734075 Additional tests of fiber swap still shows problematic channels] (Bill)
 
#* [https://logbooks.jlab.org/entry/3734075 Additional tests of fiber swap still shows problematic channels] (Bill)
 +
#** PMT/module replacement plan (Bill, Justin)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* New production [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2019-September/000458.html announcement e-mail]
 
#* New production [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2019-September/000458.html announcement e-mail]
 
#** Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
 
#** Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
#* New simulation samples
+
#* New simulation samples (10M events of &rho; and &phi; samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
#**
+
 
#* Commissioning LUT analyses (All)
 
#* Commissioning LUT analyses (All)
 
#** Cherenkov ring fit (Roman)  
 
#** Cherenkov ring fit (Roman)  

Latest revision as of 12:54, 14 October 2019

Meeting Information

GlueX DIRC Meeting
Monday October 14, 2019
1:00 pm, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Mirror replacement update
    • Full size gluing samples and water test (Tim, Keith)
      • Thermal expansion test #1 Initial setup Result
      • Thermal expansion test #2 Initial setup Result
      • Upcoming test #3: 2 new full length pieces with additional glue to ensure adequate seal (this week)
    • Mirror cutting at Danny's glass (Tim)
    • Borosilicate procurement and delivery (Tim)
    • North OB strongback delivery (Tim/Scot)
  3. LED diffuser Update (Bill)
  4. Readout tests (Justin, Bill, All)
  5. Spring 2019 DIRC Commissioning Analysis (All)
    • New production announcement e-mail
      • Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
    • New simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
    • Commissioning LUT analyses (All)
      • Cherenkov ring fit (Roman)
      • Commissioning Analyses Update (Ahmed)
    • Commissioning FastDIRC update (Yunjie)
  6. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  7. Software overview and tasks (All)
  8. AOB