Difference between revisions of "October 21, 2021 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 9: Line 9:
 
* Testing status - Beni/Elton
 
* Testing status - Beni/Elton
 
* Design/Fab/Procurement status
 
* Design/Fab/Procurement status
** Installation/assy 3D Model and dwgs
+
** Lead absorbers - out for bid
*** Lead absorbers - out for bid
+
* Installation/assy 3D Model and dwgs
 
*** DS Chamber orientation?
 
*** DS Chamber orientation?
 
*** Scintillator orientation
 
*** Scintillator orientation

Revision as of 14:27, 21 October 2021

Meeting Time and Place

Thursday October 21, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/September_09,_2021_CPP_Design_Meeting
  • Testing status - Beni/Elton
  • Design/Fab/Procurement status
    • Lead absorbers - out for bid
  • Installation/assy 3D Model and dwgs
      • DS Chamber orientation?
      • Scintillator orientation
      • assembly components - drawings in review
    • Stand All parts here - to be assembled in the TEDF High bay
      Cpp stand 5.jpg
      Cpp stand 2.jpg
      Cpp stand 3.jpg
    • Steel - all received
      Cpp steel 3.jpg
    • Fcal platform mods
      • Cutouts complete
      • Floor Rails installed and aligned
        Cpp rails.jpg
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes and Action Items

Action Items