Difference between revisions of "October 25, 2019 FCAL Insert Design Meeting"
From GlueXWiki
(Created page with "= Meeting Time and Place == Wednesday Oct, 9 10:00 am At Jefferson Lab, room TED 2504 * Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernando,...") |
(→Agenda) |
||
Line 16: | Line 16: | ||
** 15cm square with 6mm 45 degree bevel | ** 15cm square with 6mm 45 degree bevel | ||
* Cooling of blocks - 2.1 KW needed | * Cooling of blocks - 2.1 KW needed | ||
− | * Support structure and assy sequence | + | * Support structure and assy sequence |
+ | ** [[Media:Module installation procedure.pdf]] | ||
* electronics patch panels DS of crystal pmts | * electronics patch panels DS of crystal pmts | ||
* Discuss Testing of soldered assembly and mag field testing | * Discuss Testing of soldered assembly and mag field testing | ||
* Discuss test fixture for PMTs in beam | * Discuss test fixture for PMTs in beam | ||
− | |||
== Minutes and Action Items == | == Minutes and Action Items == |
Revision as of 12:30, 28 October 2019
Meeting Time and Place =
Wednesday Oct, 9 10:00 am At Jefferson Lab, room TED 2504
- Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernando, Chris Stanislav
Agenda
- Action items from last meeting https://halldweb.jlab.org/wiki/index.php/October_9,_2019_FCAL_Insert_Design_Meeting
- Discuss Tungsten absorber
- Cover 1.5 crystals ok?
- Rohacell supported
- Monitoring System
- Testing plan
- 1mm fibers
- 15cm square with 6mm 45 degree bevel
- Cooling of blocks - 2.1 KW needed
- Support structure and assy sequence
- electronics patch panels DS of crystal pmts
- Discuss Testing of soldered assembly and mag field testing
- Discuss test fixture for PMTs in beam