* Need to ask Matt Shepherd for measurements of previous FCAL lead glass modules
 
* Need to ask Matt Shepherd for measurements of previous FCAL lead glass modules
 
* Keith presented a fairly detailed assembly sequence and plan
 
* Keith presented a fairly detailed assembly sequence and plan
 +
** Everyone was relatively happy but always a concern for stack up tolerances and forces
 +
* Discussed Signal and HV cables and Fernado mentioned an alternate plan with patch panel at top and bottom of array
 +
** More discussion needed

Latest revision as of 16:25, 9 December 2019

Meeting Time and Place =

Wednesday Oct, 9 10:00 am At Jefferson Lab, room TED 2504

  • Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernando, Chris Stanislav

Agenda

Minutes and Action Items

  • Josh has 1mm fiber for test
  • Mu metal shields are in house - 6mm shorter than steel
  • 12 crystal test setup
    • No Survey needed for 12 crystal tests (initially)
    • Need vertical adjustment capability
  • Need to ask Matt Shepherd for measurements of previous FCAL lead glass modules
  • Keith presented a fairly detailed assembly sequence and plan
    • Everyone was relatively happy but always a concern for stack up tolerances and forces
  • Discussed Signal and HV cables and Fernado mentioned an alternate plan with patch panel at top and bottom of array
    • More discussion needed