(Created page with "= Meeting Time and Place == Friday October 28, 2022 9:30am TED 2559 and Teams == Agenda == * Safety - pressure safety * All appraisals completed by Thanksgiving! ** Self as...") |
(→Agenda) |
||
Line 43: | Line 43: | ||
*** HDList updates | *** HDList updates | ||
** KLONG dwgs | ** KLONG dwgs | ||
− | * Controls - | + | * Controls - Bobby is responsible for PLC |
* General Maintenance | * General Maintenance | ||
* On Call - | * On Call - |
Revision as of 09:21, 28 October 2022
Meeting Time and Place =
Friday October 28, 2022 9:30am TED 2559 and Teams
Agenda
- Safety - pressure safety
- All appraisals completed by Thanksgiving!
- Self assessments due today
- Update Individual Career Profile
- Physics all hands meeting December 6
- January Schedule 3rd-14th
- Get DIRC operational
- Install new .o25 orifice
- Modify Tagger Microscope
- Install New Profiler
- Remove ComCal?
- Install GEM?
- BCAL/FDC chiller swap
- Get DIRC operational
- Hall D current Tasks
- FCAL Insert Module fabrication
- brass straps
- matching mu metal to steel shields - 200 more to go
- FCAL2 Design tidbits
- Monitoring panel discussion - Stephanie
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass, outer plexiglass
- Tungsten
- Insulation
- Scaffolding on temporary platform
- Electronic patch panels
- Liftable frame mods
- Cable trays
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks - S&A
- Epoxy fittings to Cooling Manifold
- Weld water manifold supports
- Bend/solder copper tubes - complete
- Epoxy fittings to tubes
- JBweld conductive epoxy tubes to blocks
- HDList updates
- KLONG dwgs
- FCAL Insert Module fabrication
- Controls - Bobby is responsible for PLC
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas