Difference between revisions of "October 9, 2013 tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Hardware Agenda)
(Hardware Agenda)
Line 20: Line 20:
 
# FDC Update
 
# FDC Update
 
# Calibration Discussion
 
# Calibration Discussion
## Current "calibrations" in use in reconstruction:
+
#* Current "calibrations" in use in reconstruction:
### Function for CDC time-to-distance relationship
+
#** Function for CDC time-to-distance relationship
### Function for correction for deflection due to Lorentz force in FDC
+
#** Function for correction for deflection due to Lorentz force in FDC
### Charge-to-energy unit conversion for FDC cathode strips and CDC wires
+
#** Charge-to-energy unit conversion for FDC cathode strips and CDC wires
 +
#* Current "geometry" adjustments possible??
  
 
== Minutes ==
 
== Minutes ==
 
Present:
 
Present:

Revision as of 10:07, 9 October 2013

_TOC__

Meeting Time and Place

Wednesday October 9, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. CDC Update
  3. FDC Update
  4. Calibration Discussion
    • Current "calibrations" in use in reconstruction:
      • Function for CDC time-to-distance relationship
      • Function for correction for deflection due to Lorentz force in FDC
      • Charge-to-energy unit conversion for FDC cathode strips and CDC wires
    • Current "geometry" adjustments possible??

Minutes

Present: