Difference between revisions of "October 9, 2013 tracking CDC/FDC"
From GlueXWiki
(→Hardware Agenda) |
(→Hardware Agenda) |
||
Line 25: | Line 25: | ||
#** Charge-to-energy unit conversion for FDC cathode strips and CDC wires | #** Charge-to-energy unit conversion for FDC cathode strips and CDC wires | ||
#* Current "geometry" adjustments possible?? | #* Current "geometry" adjustments possible?? | ||
+ | #** Inter alignment between CDC and FDC | ||
+ | #** Absolute locations of CDC and FDC | ||
+ | #** Adjustments to wire locations | ||
+ | #** Possible rotations. | ||
== Minutes == | == Minutes == | ||
Present: | Present: |
Revision as of 10:10, 9 October 2013
_TOC__
Meeting Time and Place
Wednesday October 9, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone, dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Hardware Agenda
- Announcements
- CDC Update
- Moving the CDC to Jefferson Lab - Logistics CDC_travel_plans
- FDC Update
- Calibration Discussion
- Current "calibrations" in use in reconstruction:
- Function for CDC time-to-distance relationship
- Function for correction for deflection due to Lorentz force in FDC
- Charge-to-energy unit conversion for FDC cathode strips and CDC wires
- Current "geometry" adjustments possible??
- Inter alignment between CDC and FDC
- Absolute locations of CDC and FDC
- Adjustments to wire locations
- Possible rotations.
- Current "calibrations" in use in reconstruction:
Minutes
Present: