Difference between revisions of "October 9, 2013 tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Hardware Agenda)
Line 19: Line 19:
 
#* Moving the CDC to Jefferson Lab - Logistics [[CDC_travel_plans]]  
 
#* Moving the CDC to Jefferson Lab - Logistics [[CDC_travel_plans]]  
 
# FDC Update
 
# FDC Update
# Calibration Discussion
+
# Calibration Discussion ([[File:20131009_cdc_calib.pdf|Slides]])
 
#* Current "calibrations" in use in reconstruction:
 
#* Current "calibrations" in use in reconstruction:
 
#** Function for CDC time-to-distance relationship
 
#** Function for CDC time-to-distance relationship

Revision as of 10:28, 9 October 2013

_TOC__

Meeting Time and Place

Wednesday October 9, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. CDC Update
  3. FDC Update
  4. Calibration Discussion (File:20131009 cdc calib.pdf)
    • Current "calibrations" in use in reconstruction:
      • Function for CDC time-to-distance relationship
      • Function for correction for deflection due to Lorentz force in FDC
      • Charge-to-energy unit conversion for FDC cathode strips and CDC wires
    • Current "geometry" adjustments possible??
      • Inter alignment between CDC and FDC
      • Absolute locations of CDC and FDC
      • Adjustments to wire locations
      • Possible rotations.

Minutes

Present: