* Discussed Tungsten absorber
 
* Discussed Tungsten absorber
 
** No decision on coverage, still at 1.5 crystals
 
** No decision on coverage, still at 1.5 crystals
 +
* Monitoring System
 +
** Need to order diamond end mill - Tim
 +
** 1mm fibers for test
 +
** 2 Test samples made, 15cm square with 6mm 45 degree bevel
 +
* Cooling of blocks - 2.1 KW needed
 +
** Inner cooling ring move to be in line with outer to keep area behind lead-glass module clear for repairs
  
 
== Action items ==
 
== Action items ==

Revision as of 13:33, 23 October 2019

Meeting Time and Place =

Wednesday Oct, 9 2:00 pm At Jefferson Lab, room TED 2504

  • Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernando, Chris Stanislav

Agenda

  • Action items from last meeting https://halldweb.jlab.org/wiki/index.php/September_25,_2019_FCAL_Insert_Design_Meeting
  • Discuss Tungsten absorber
    • Cover 1.5 crystals ok?
    • Rohacell supported
  • Monitoring System
    • Use 1/2" Acrylic sheet with 45 degree angles on edges
    • Testing plan
    • 1mm fibers
    • 15cm square with 6mm 45 degree bevel
  • Cooling of blocks - 2.1 KW needed
    • 2 Chillers like those used for BCAL ($16K ea)
    • 4 water to air Heat exchangers around crystal area
    • 9 parallel circuits for each chiller
    • potted copper tube into aluminum blocks
    • Cooling of inner tube - removable plate
    • Proposed manifold similar to BCAL - needs to clear for FCAL module removal
  • Support structure and assy sequence
  • electronics patch panels DS of crystal pmts
  • Discussed Brazing of PMT module straps and new mag field tests
    • Sasha wishes to assemble a new 9 module array for magnetic field testing
      • 18mm diameter light guides are needed - josh found some on Amazon - tim will order
      • 6mm longer with 50 micron larger ID mag shield steel needed - Submitted to machine shop Media:1020_shield.pdf
      • additional mu metal shields needed (same as previous - 350 microns) - Tim ordered Due Oct 18-
      • Have steel shields annealed - Tim looking into it >900C
  • Discuss test fixture for PMTs in beam
    • Need to fabricate steel case - Media:Steel_shield.pdf
    • need to fabricate support structure - Tim
    • Need to fabricate feedthru panel - Josh/Tim
    • need to fabricated aluminum base plate - Josh/Tim

Minutes and Action Items

  • Discussed Tungsten absorber
    • No decision on coverage, still at 1.5 crystals
  • Monitoring System
    • Need to order diamond end mill - Tim
    • 1mm fibers for test
    • 2 Test samples made, 15cm square with 6mm 45 degree bevel
  • Cooling of blocks - 2.1 KW needed
    • Inner cooling ring move to be in line with outer to keep area behind lead-glass module clear for repairs

Action items