Offline Monitoring Data Validation

From GlueXWiki
Revision as of 18:53, 8 February 2019 by Sdobbs (Talk | contribs) (Checklist)

Jump to: navigation, search

This page contains the procedure for checking if production runs are of good quality and can be used for physics analysis.

Run Periods

Procedure

For each production run, do the following:

  • Go to the | Offline Run Browser page.
  • Follow the steps outlined in the checklist below.
  • Certify that each section is okay
    • (DB + script to be developed)
  • Set run status = 1 in RCDB
    • (script provided)

Run Statuses

  • -1 - unchecked
  • 0 - rejected (not physics-quality)
  • 1 - approved
  • 2 - approved long/"mode 8" data
  • 3 - calibration / systematic studies

Checklist

Reference run for 2017-01: 30780

Reference run for 2018-01: 40933/4

Reference run for 2018-08: 51388

  • BCAL
    • Check Occupancy - Reference: [ link ]
    • Check Hit Efficiency - Reference: [ link ]
    • Check BCAL Recon. 1 - Reference: [ link ]
    • Check BCAL Recon. 2 - Reference: [ link ]
    • Check BCAL Matching - Reference: [ link ]

BCAL Reference Plots

  • CDC
    • Check Occupancy - Reference: [ link ]
    • Check Time-to-distance - Reference: [ link ]
    • Check dE/dx - Reference: [ link ]
    • Check Efficiency- Reference: [ link ]

CDC Reference Plots

  • FCAL
    • Check Occupancy - Reference: [ link ]
    • Check FCAL Hits 1 - Reference: [ link ]
    • Check FCAL Hits 2 - Reference: [ link ]
    • Check FCAL Clusters 1 - Reference: [ link ]
    • Check FCAL Recon. 1 - Reference: [ link ]
    • Check FCAL Recon. 2 - Reference: [ link ]
    • Check FCAL Matching - Reference: [ link ]

FCAL Reference Plots

  • FDC
    • Check Package 1 Occupancy - Reference: [ link ]
    • Check Package 2 Occupancy - Reference: [ link ]
    • Check Package 3 Occupancy - Reference: [ link ]
    • Check Package 4 Occupancy - Reference: [ link ]

FDC Reference Plots

  • PS
    • Check Occupancy - Reference: [ link ]
    • Check Timing Alignment - Reference: [ link ]

PS Reference Plots

  • SC
    • Check Occupancy - Reference: [ link ]
    • Check SC Recon. 1 - Reference: [ link ]
    • Check SC Recon. 2 - Reference: [ link ]
    • Check SC Matching - Reference: [ link ]

SC Reference Plots


  • TAGH
    • Check Tagger Occupancy - Reference: [ link ]
    • Check TAGH Hits 2 - Reference: [ link ]

TAGH Reference Plots

  • TAGM
    • Check Timing ADC-RF - Reference: [ link ]
    • Check Timing T-ADC - Reference: [ link ]

TAGM Reference Plots

  • TOF
    • Check Occupancy - Reference: [ link ]
    • Check TOF Matching 1 - Reference: [ link ]
    • Check TOF Matching 2 - Reference: [ link ]

TOF Reference Plots

  • RF
    • Check timing offsets - Reference: [ link ]
      • Should be centered around zero

RF Reference Plots


  • Timing
    • Check Calorimeter Timing - Reference: [ link ]
    • Check Drift Chamber Timing - Reference: [ link ]
    • Check PID System Timing - Reference: [ link ]
    • Check Tagger Timing - Reference: [ link ]
    • Check Track Matched Timing - Reference: [ link ]
    • Check Tagger/RF Timing - Reference: [ link ]
    • Check Tagger/SC Timing - Reference: [ link ]

Timing Reference Plots

  • Analysis
    • Tracking 1 - [ link ]
    • Tracking 3 - [ link ]
    • Check BCAL pi0 - Reference: [ link ]
    • Check BCAL/FCAL pi0 - Reference: [ link ]
    • Check p+2pi - Reference: [ link ]
    • Check p+3pi - Reference: [ link ]
    • Check p+pi0g - Reference: [ link ]

Analysis Reference Plots