Below I list the high-level performance requirements and design goals of Hall D DAQ/Online/Control systems.  All groups working on the project, e.g. JLab DAQ group, JLab Electronics group, etc, must design to meet them.   
+
Below I list the overall performance requirements and design goals of Hall D DAQ/Online/Control systems.  All groups working on the project, e.g. JLab DAQ group, JLab Electronics group, etc, must design to meet them.   
  
 
The JLab DAQ group will develop a similar document, then the two will be reconciled and dates, performance milestones, etc. will be added.  We will repeat this with other JLab groups as needed.
 
The JLab DAQ group will develop a similar document, then the two will be reconciled and dates, performance milestones, etc. will be added.  We will repeat this with other JLab groups as needed.
Line 7: Line 7:
  
 
==Basic Requirements==
 
==Basic Requirements==
 +
 +
At turn-on Hall D will accept 10**7 photons/sec, with an expected trigger rate (from the design report) of 18 kHz, assuming a L1 rejection rate of 50%.  At high luminosity the beam rate will be ten times higher, or 10**8 photons/sec, giving an expected trigger rate of 180 kHz assuming the same L1 rejection rate.  If the events average 5 kByte then the data rate off the detector at low luminosity will be 90 MByte/sec, and 900 MByte/sec at high luminosity.  At low luminosity there will be no L3 rejection, and all events will be written to disk (at 90 MByte/sec).  At high luminosity we expect a L3 rejection rate of a factor of 10, so the rate to disk will also be 90 MByte/sec.
 +
 +
The DAQ design must have a little headroom above the expected rates.  Thus I propose the following design goals:

Revision as of 09:40, 24 July 2007

Overview

Below I list the overall performance requirements and design goals of Hall D DAQ/Online/Control systems. All groups working on the project, e.g. JLab DAQ group, JLab Electronics group, etc, must design to meet them.

The JLab DAQ group will develop a similar document, then the two will be reconciled and dates, performance milestones, etc. will be added. We will repeat this with other JLab groups as needed.


Basic Requirements

At turn-on Hall D will accept 10**7 photons/sec, with an expected trigger rate (from the design report) of 18 kHz, assuming a L1 rejection rate of 50%. At high luminosity the beam rate will be ten times higher, or 10**8 photons/sec, giving an expected trigger rate of 180 kHz assuming the same L1 rejection rate. If the events average 5 kByte then the data rate off the detector at low luminosity will be 90 MByte/sec, and 900 MByte/sec at high luminosity. At low luminosity there will be no L3 rejection, and all events will be written to disk (at 90 MByte/sec). At high luminosity we expect a L3 rejection rate of a factor of 10, so the rate to disk will also be 90 MByte/sec.