* Prototype software component framework - done Jun 2007
 
* Prototype software component framework - done Jun 2007
 
* Prototype run control system - done Jun 2007
 
* Prototype run control system - done Jun 2007
 +
* Production event transfer system - done Jun 2007
 
* Production inter-process communication package - done Nov 2007
 
* Production inter-process communication package - done Nov 2007
* Prototype front-end driver software (almost done)
 
  
 
'''[[2008]]'''
 
'''[[2008]]'''
 +
(see also CD-3 milestones above)
 
* Prototype staged/parallel event builder by Apr 2008, PED deliverable
 
* Prototype staged/parallel event builder by Apr 2008, PED deliverable
* Prototype single crate timing and trigger distribution by Jun 2008
+
* Prototype single crate timing and trigger distribution by Nov 2008
* Preliminary complete trigger design by Jun 2008
+
* Simulation of full system at low rate (run control, ET, multiple EB's, ER, etc) by Nov 2008
* Prototype remaining software components by Jun 2008
+
* Prototype L3 farm management software by Nov 2008
* Simulation of full system at low rate (run control, ET, multiple EB's, ER, etc) by Oct 2008
+
* Develop CODA-based electronics test stands by Nov 2008
* Prototype L3 farm management software by Oct 2008
+
* Develop CODA-based electronics test stands by Oct 2008
+
  
 
'''[[2009]]'''
 
'''[[2009]]'''
 
* Prototype multi-crate timing and trigger distribution by Oct 2009
 
* Prototype multi-crate timing and trigger distribution by Oct 2009
* Demonstate single-crate high-speed readout by Oct 2009
 
 
* Complete trigger design by Oct 2009
 
* Complete trigger design by Oct 2009
  
 
'''[[2010]]'''
 
'''[[2010]]'''
 
* Demonstrate multi-crate high-speed readout by Oct 2010
 
* Demonstrate multi-crate high-speed readout by Oct 2010
 
+
* Simulation of full system at high rate
'''[[2011]]'''
+
* Production front-end driver software
* Simulation of full system at high rate by 2011.
+
* Production trigger and timing distribution
* Production front-end driver software by 2011.
+
* Production experiment control system
* Production trigger and timing distribution by 2011.
+
* Production component framework
* Production experiment control system by 2011.
+
* Production software components
* Production component framework by 2011.
+
* Production software components by 2011.
+
  
  

Revision as of 10:50, 5 December 2007

Needed for CD-3 May 2008

  • Functional design of timing distribution.
  • Functional design of energy-sum trigger.
  • Full DAQ functional design including trigger distribution.
  • 80% electronics design for all trigger and DAQ hardware. N.B. circuit layouts and component choice generally not required. Prototypes only needed to demonstrate proof-of-principle of speculative ideas.
    • front-end timing distribution.
    • trigger creation and distribution.
    • TI board.
    • TS board.
  • Preliminary libraries for reading out custom boards (F1TDC, FADC, etc).
  • Prototypes of major CODA 3 components: ROC, EMU, ER, and run control.
    • n.b. already have cMsg, ET, EVIO, etc.
  • Demonstrate 200 kHz triggering and pipeline readout in single crate
  • Understanding of event size, backplane and network bandwidths, etc.
  • Choice of controls framework and basic implementation plan.


DAQ Milestones

The full DAQ (approximately 80 full crates) must be ready for testing the complete detector with cosmic or pulser triggers by 1Q FY 2014. First beam to the hall is expected in 4Q FY 2014, with low-rate production data taking expected to start in 4Q FY 2015. High-rate production data taking may start as early as 4Q FY 2016, assuming funds are available to upgrade the detector.


DAQ Development/Demonstration Milestones

2006

  • Production event transfer system - done Aug 2006
  • Procuction event i/o package - done Aug 2006

2007

  • DAQ test farm by 28-Sep-2007, PED deliverable - done Jan 2007
  • Prototype software component framework - done Jun 2007
  • Prototype run control system - done Jun 2007
  • Production event transfer system - done Jun 2007
  • Production inter-process communication package - done Nov 2007

2008 (see also CD-3 milestones above)

  • Prototype staged/parallel event builder by Apr 2008, PED deliverable
  • Prototype single crate timing and trigger distribution by Nov 2008
  • Simulation of full system at low rate (run control, ET, multiple EB's, ER, etc) by Nov 2008
  • Prototype L3 farm management software by Nov 2008
  • Develop CODA-based electronics test stands by Nov 2008

2009

  • Prototype multi-crate timing and trigger distribution by Oct 2009
  • Complete trigger design by Oct 2009

2010

  • Demonstrate multi-crate high-speed readout by Oct 2010
  • Simulation of full system at high rate
  • Production front-end driver software
  • Production trigger and timing distribution
  • Production experiment control system
  • Production component framework
  • Production software components


DAQ Detector Needs

DAQ systems of various sorts will be needed during detector development, construction, and checkout. Below, "parallel" means that parallel or staged event building is needed. "Small" means four crates or less, and "large" means more than four crates. In general, parallel readout is only needed at very high rates, where a single network connection cannot handle all the data.

  • Single-crate DAQ systems are needed now (Jul-2007).
  • Small systems will be needed by Oct 2008.
  • Single-crate with trigger/timing needed for FCAL test Summer 2008
  • Large systems will be needed by Oct 2010.
  • Parallel, large systems will be needed by Oct 2011.

In all cases the readout crates may be full.

(Elton suggests creating a table of configurations needed...ejw, 14-Aug-2007)


Online/Controls Milestones