12GeV (High Priority) Projects Suitable for Outside Groups

  • Event display
    • Fully develop online event display using bCNU, EVE or other framework.
    • estimate 22 man-weeks effort.
    • Status:
      • Have working (preliminary) version using bCNU framework (CNU students).
      • Have proof of concept using EVE (Dmitry).


  • Event monitoring
    • Develop JANA framework for RootSpy-enabled online monitoring, collect detector histogram plugins from detector groups.
    • estimate 8 man-weeks effort.
    • Status:
      • Elliott W has plugin templates.
      • Northwestern Univ. interested.


  • RootSpy Histogram archive/retrieval
    • Develop histogram archive/retrieval system for the RootSpy system.
    • estimate 5 man-weeks effort.
    • Status:
      • Prototype RootSpy system exists.
      • Northwestern University interested.


  • Process monitoring
    • Develop process monitoring system.
    • estimate 4 man-weeks effort.
    • Status:
      • Have example from CLAS.


  • Hardware monitoring
    • Develop computer hardware monitoring system.
    • estimate 6 man-weeks effort.
    • Status:
      • Vardan has many ideas.


  • EPICS gui's using Control System Studio
    • Develop many EPICS gui's.
    • estimate 8 man-weeks effort.
    • Status:
      • A few developed by Hovanes, Nerses, Vanik and Beni.


  • SNS EPICS alarm system (BEAST)
    • Test and make recommendation for implementation.
    • estimate 4 man-weeks effort.
    • Status:


  • SCONS ("make" replacement)
    • Develop online build system using SCONS.
    • estimate 4 man-weeks effort.
    • Status:
      • Start with Maurizio's system for CLAS12.


12GeV (High Priority) Projects Suitable for Local Groups

  • Computer monitoring/alarm system
    • Learn about Ganglia, NAGIOS and similar systems, choose one and implement.
    • estimate 4 man-weeks effort
    • Status:
      • Paul Letta will probably do this.


  • Conditions database
    • Develop conditions database.
    • estimate 4 man-weeks effort
    • Status:
      • Mark has design, Dmitry will probably implement this.


  • Farm manager CODA component
    • Develop CODA component capable of managing monitoring of level 3 farm system.
    • estimate 7 man-weeks effort
    • Status:
      • Vardan will probably do this.


  • Front end readout lists
    • Develop a generic readout list scheme capable of detecting which boards are in a crate and reading them out efficiently.
    • Must implement only those boards listed in operator-chosen trigger configuration.
    • Must also document configuration in Hall D database.
    • estimate 6 man-week effort.
    • Status:
      • Bryan developed crate scan software.


  • Alarm system
    • Implement experiment alarm system based on recommendations (earlier task).
    • estimate 8 man-weeks effort.
    • Status:
      • Current best choice seems to be BEAST from SNS.


  • Run bookkeeping scripts
    • Develop scripts to store pre- and post-run information in online databases.
    • estimate 4 man-week effort
    • Status:
      • Most if not all can be stored in the to-be-developed conditions database.


  • Out of band events
    • Develop server to insert out-of-band events into the event stream.
    • estimate 6 man-week effort.
    • Status:
      • Same idea as was done for CLAS.


  • Translation table
    • Implement translation table in JANA.
    • estimate 3 man-week effort
    • Status:
      • Prototype translation table exists.


Other (Low Priority) Projects Suitable for Outside Groups

  • Remote monitoring of experiment
    • Develop system to allow remote monitoring of histograms, EPICS data, etc.
    • May be different mechanism for EPICS data, hist, etc.
    • estimate 12 man-weeks effort.
    • Status:


  • Info Server for generic information storage and retreival
    • Investigate and define role for generic cMsg-based info server (a la CLAS), implement if useful.
    • estimate 2 man-weeks effort design, 6 man-weeks implement.
    • Status:


  • Level 3 algorithm
    • Develop L3 rejection algorithm for use in JANA online framework.
    • estimate 26 man-weeks effort.
    • Status:
      • MIT group is interested and has experience from LHCb.


  • RootSpy development
    • Further develop RootSpy package, including mini-HBook feature.
    • estimate 6 man-weeks effort.
    • Status:
      • See Dave L's note for suggested improvements.
      • Summer student worked on mini-HBook.
      • Northwestern Univ. interested.


Other (Low Priority) Projects Suitable for Local Groups

  • Top-level experiment control control system and gui
    • Develop top-level experiment control configuration and associated gui.
    • Combines run control and slow controls into one interface.
    • estimate 6 man-week effort.
    • Status:
      • Vardan best suited to do this, not needed unti after 2015.


  • Event stream reorderer
    • Develop code to reorder events after monitoring or level 3 farm.
    • estimate 4 man-week effort.
    • Status:
      • Not sure this is needed.


In progress

  • Event disentangler
    • Develop Hall D specific event disentangler capable of handling full luminosity.
    • Determine where it should run (ROC, EB, both?).
    • estimate 6 man-week effort.
    • Status:
      • Carl best choice, he's done some work on this already.