Difference between revisions of "Online Work Breakdown"
From GlueXWiki
m |
|||
Line 1: | Line 1: | ||
(in preparation...ejw, aug-2007) | (in preparation...ejw, aug-2007) | ||
+ | ==Needed for Subsystem Review May 2008 and for CD-3 Review Summer 2008== | ||
+ | |||
+ | * Revisit and verify energy-sum algorithm with latest hardware design, etc. | ||
+ | ** Eugene working on event simulation | ||
+ | ** Chinese group will work on algorithm with Dave D's help | ||
+ | ** David L will help with offline software | ||
+ | ** Elliott will kibbitz | ||
+ | * Functional design of overall timing distribution system. | ||
+ | ** Chris, Ed, Fernando | ||
+ | * Functional design of energy-sum trigger. | ||
+ | ** Dave D, Chris, Fernando | ||
+ | * Functional design of overall trigger distribution system. | ||
+ | ** Ed, Chris, Dave A, Fernando | ||
+ | * Functional design of full DAQ. | ||
+ | ** Graham, Dave A, Elliott | ||
+ | * Electronics functional block design including full block specification for all trigger and DAQ hardware, suitable to be sent off to industry for component choice, layout, and fabrication. Prototypes/testing only needed to demonstrate proof-of-principle of speculative ideas. | ||
+ | ** timing distribution system. | ||
+ | *** Chris, Ed | ||
+ | ** energy-sum boards. | ||
+ | *** Dave D, Chris | ||
+ | ** TI board. | ||
+ | *** Ed, Dave A | ||
+ | ** TS board. | ||
+ | *** Ed, Dave A | ||
+ | * Preliminary libraries for reading out existing custom boards (F1TDC, FADC, etc). | ||
+ | ** Dave A | ||
+ | * Prototypes of major CODA 3 components: ROC, EMU, ER, and run control. | ||
+ | ** Graham, Dave A, Vardan, Carl, Elliott | ||
+ | ** n.b. already have cMsg, ET, EVIO, etc. | ||
+ | * Understanding of event size, backplane and network bandwidth requirements, etc. | ||
+ | ** Eugene, David L, Fernando, Elliott | ||
+ | * Demonstrate 200 kHz triggering and high-speed (1E CBT? 2E CBT?) readout in single crate. | ||
+ | ** Dave A, Ed | ||
+ | * Choice of controls framework and basic implementation plan. | ||
+ | ** Elliott | ||
+ | |||
+ | |||
+ | ==Overall Work Breakdown== | ||
* L1 Trigger | * L1 Trigger |
Revision as of 16:33, 6 December 2007
(in preparation...ejw, aug-2007)
Needed for Subsystem Review May 2008 and for CD-3 Review Summer 2008
- Revisit and verify energy-sum algorithm with latest hardware design, etc.
- Eugene working on event simulation
- Chinese group will work on algorithm with Dave D's help
- David L will help with offline software
- Elliott will kibbitz
- Functional design of overall timing distribution system.
- Chris, Ed, Fernando
- Functional design of energy-sum trigger.
- Dave D, Chris, Fernando
- Functional design of overall trigger distribution system.
- Ed, Chris, Dave A, Fernando
- Functional design of full DAQ.
- Graham, Dave A, Elliott
- Electronics functional block design including full block specification for all trigger and DAQ hardware, suitable to be sent off to industry for component choice, layout, and fabrication. Prototypes/testing only needed to demonstrate proof-of-principle of speculative ideas.
- timing distribution system.
- Chris, Ed
- energy-sum boards.
- Dave D, Chris
- TI board.
- Ed, Dave A
- TS board.
- Ed, Dave A
- timing distribution system.
- Preliminary libraries for reading out existing custom boards (F1TDC, FADC, etc).
- Dave A
- Prototypes of major CODA 3 components: ROC, EMU, ER, and run control.
- Graham, Dave A, Vardan, Carl, Elliott
- n.b. already have cMsg, ET, EVIO, etc.
- Understanding of event size, backplane and network bandwidth requirements, etc.
- Eugene, David L, Fernando, Elliott
- Demonstrate 200 kHz triggering and high-speed (1E CBT? 2E CBT?) readout in single crate.
- Dave A, Ed
- Choice of controls framework and basic implementation plan.
- Elliott
Overall Work Breakdown
- L1 Trigger
- Trigger hardware and cabling
- Trigger programming
- Trigger/timing distribution
- Trigger distribution hardware and cabling
- Timing distribution hardware and cabling
- Readout electronics
- Crates
- Crate monitoring
- Modules
- Detector cabling, esp. final two feet
- Module programming
- Event building
- Event builder hardware and network configuration
- Event builder programming
- Sync and other special events
- ET system configuration
- L3 trigger
- L3 farm hardware and networks
- ET system configuration
- Event distribution system
- Farm management software
- Event storage
- Raid hardware
- Hardware connection to silo
- File transfer software
- Experiment and slow controls
- Event monitoring/display
- Online event display
- Online event monitoring, display of results, alarm system
- Electronic record keeping
- Electronic logbook
- Run database hardware and configuration
- Software to enter data in to run database
- Computers, networks, telecom
- Computers for hall and counting house
- UPS, distribution panel, wiring
- Network in hall and counting house
- Switches
- Cabling
- Telecom in hall and counting house
- Distribution panels
- Cabling
- Phones, installation
- Computers for hall and counting house
- Counting house physical environment
- Furniture
Notes
- Cabling has to be carefully planned and coordinated among a number of groups to ensure maintenance is simple