This document is continuously in preparation...ejw, Aug 2007
 +
 +
==Overall Work Breakdown==
 +
 
* L1 Trigger
 
* L1 Trigger
* Trigger distribution
+
** Trigger hardware and cabling
 +
** Trigger programming
 +
* Trigger/timing distribution
 +
** Trigger distribution hardware and cabling
 +
** Timing distribution hardware and cabling
 
* Readout electronics
 
* Readout electronics
 +
** Crates
 +
** Crate monitoring
 +
** Modules
 +
** Detector cabling, esp. final two feet
 +
** Module programming
 
* Event building
 
* Event building
 +
** Event builder hardware and network configuration
 +
** Event builder programming
 +
** Sync and other special events
 +
** ET system configuration
 
* L3 trigger
 
* L3 trigger
 +
** L3 farm hardware and networks
 +
** ET system configuration
 +
** Event distribution system
 +
** Farm management software
 
* Event storage
 
* Event storage
 +
** Raid hardware
 +
** Hardware connection to silo
 +
** File transfer software
 
* Experiment and slow controls
 
* Experiment and slow controls
 
* Event monitoring/display
 
* Event monitoring/display
 +
** Online event display
 +
** Online event monitoring, display of results, alarm system
 
* Electronic record keeping
 
* Electronic record keeping
 +
** Electronic logbook
 +
** Run database hardware and configuration
 +
** Software to enter data in to run database
 
* Computers, networks, telecom
 
* Computers, networks, telecom
 +
** Computers for hall and counting house
 +
*** UPS, distribution panel, wiring
 +
** Network in hall and counting house
 +
*** Switches
 +
*** Cabling
 +
** Telecom in hall and counting house
 +
*** Distribution panels
 +
*** Cabling
 +
*** Phones, installation
 
* Counting house physical environment
 
* Counting house physical environment
 +
** Furniture
 +
 +
 +
==Notes==
 +
 +
* Cabling has to be carefully planned and coordinated among a number of groups to ensure maintenance is simple

Latest revision as of 12:12, 28 February 2008

This document is continuously in preparation...ejw, Aug 2007

Overall Work Breakdown

  • L1 Trigger
    • Trigger hardware and cabling
    • Trigger programming
  • Trigger/timing distribution
    • Trigger distribution hardware and cabling
    • Timing distribution hardware and cabling
  • Readout electronics
    • Crates
    • Crate monitoring
    • Modules
    • Detector cabling, esp. final two feet
    • Module programming
  • Event building
    • Event builder hardware and network configuration
    • Event builder programming
    • Sync and other special events
    • ET system configuration
  • L3 trigger
    • L3 farm hardware and networks
    • ET system configuration
    • Event distribution system
    • Farm management software
  • Event storage
    • Raid hardware
    • Hardware connection to silo
    • File transfer software
  • Experiment and slow controls
  • Event monitoring/display
    • Online event display
    • Online event monitoring, display of results, alarm system
  • Electronic record keeping
    • Electronic logbook
    • Run database hardware and configuration
    • Software to enter data in to run database
  • Computers, networks, telecom
    • Computers for hall and counting house
      • UPS, distribution panel, wiring
    • Network in hall and counting house
      • Switches
      • Cabling
    • Telecom in hall and counting house
      • Distribution panels
      • Cabling
      • Phones, installation
  • Counting house physical environment
    • Furniture


Notes

  • Cabling has to be carefully planned and coordinated among a number of groups to ensure maintenance is simple