Online farm testing 5-dec-2012

From GlueXWiki
Revision as of 12:35, 4 December 2012 by Wolin (Talk | contribs) (Created page with "'''Current status of online farm tests in the counting house''' * Main GBit Ethernet switch working (has 10 GBit capability). * Big UPS working. * Borrowed nodes gluon02-gluon05...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Current status of online farm tests in the counting house

  • Main GBit Ethernet switch working (has 10 GBit capability).
  • Big UPS working.
  • Borrowed nodes gluon02-gluon05 working (4 x 16 core processors, lots of memory).
  • Dave A will install 40 GBit/sec InfiniBand switch.
  • gluon02-05 have both GBit and IB interfaces.
  • DAQ software installed and working (EVIO, cMsg, ET).