PID Progress

From GlueXWiki
Revision as of 11:30, 25 June 2007 by Mashephe (Talk | contribs)

Jump to: navigation, search

&This page is to track progress toward goals that were laid out at the May 2007 PID workshop. It is hoped that all goals will be completed by the July 2007 PID workshop. The table below is derived largely from these two pages:

BCAL Items

Task People Progress Notes
z dependence of energy and time difference resolution Alex, Blake Ongoing Alex is making progress
angular dependence of energy and time difference resolution Alex, Blake Ongoing Blake report on 7/3
resolution in mean time for low energy photons Blake On Hold focus on time dif. resolution, energy and angle first
resolution in mean time for cosmics Christina Ongoing
analysis summary / TRIUMF, cosmic, JLab consistency on detector response Zisis et al. Ongoing July 3 target for draft, working with Alex
retune BCAL reconstruction / thresholds Mihajlo, Matt, Zisis, Andrei Ongoing needs samp. frac. parameterization
validate/tune standalone MC using beam test data Zisis On Hold priority on analysis writeup?

Parametric Studies

Task People Progress Notes
validate use of Pythia for generating generic hadronic backgrounds Eugene, Alex Ongoing [| Photoproduction cross sections], Eugene report on 6/26 - validate dE/dx is appropriate PID for curlers in the CDC Alex Completed