Difference between revisions of "PMT & Divider"
From GlueXWiki
(→PMT Active Base) |
(→PMT Active Base) |
||
Line 48: | Line 48: | ||
* New modifications: (1) modify resistors to limit divider current below 1 mA (2) Increase voltages on first dynodes | * New modifications: (1) modify resistors to limit divider current below 1 mA (2) Increase voltages on first dynodes | ||
− | |||
− | |||
:: - [https://logbooks.jlab.org/entry/3844449 New bases installed in the Hall] | :: - [https://logbooks.jlab.org/entry/3844449 New bases installed in the Hall] | ||
Line 56: | Line 54: | ||
:: - [https://halldweb.jlab.org/detectors/fcal2/dividers/vlad_modify/Test_Vlads_new_resistor_values.pdf Corresponding voltages] | :: - [https://halldweb.jlab.org/detectors/fcal2/dividers/vlad_modify/Test_Vlads_new_resistor_values.pdf Corresponding voltages] | ||
− | :: - [https://halldweb.jlab.org/detectors/fcal2/dividers/vlad_modify/New_DIV.pdf Resistor values] | + | :: - [https://halldweb.jlab.org/detectors/fcal2/dividers/vlad_modify/New_DIV.pdf Resistor values][https://halldweb.jlab.org/detectors/fcal2/dividers/vlad_modify/divider_resistors.xlsx ] |
− | [https://halldweb.jlab.org/detectors/fcal2/dividers/vlad_modify/divider_resistors.xlsx ] | + | |
* [https://halldweb.jlab.org/DocDB/0049/004981/004/amp_lin.pdf Linearity test of the modified amplifier (gain 3)] | * [https://halldweb.jlab.org/DocDB/0049/004981/004/amp_lin.pdf Linearity test of the modified amplifier (gain 3)] |
Revision as of 15:21, 4 May 2021
PMTs
- Hamamatsu R4125 PMT:
- Magnetic shielding
- TOSCA calculation (by Sasha Glamazdin)
- presentation
- (ppt file location /u/group/halld/Subsystems/HFCal/talk/Hybrid_FCal_shield.pptx)
- Directory with TOSCA results /u/group/halld/Subsystems/HFCal/.
PMT Active Base
Modified Active Bases (2020)
- Three active bases were modified by V.Popov. They were installed and testes using the CCAL
- (including resistor values for different amplifier gains)
- New modifications: (1) modify resistors to limit divider current below 1 mA (2) Increase voltages on first dynodes
- - New bases installed in the Hall
- Divider current after installation [1]
- - New bases installed in the Hall
Documents