Difference between revisions of "Photon Beam"

From GlueXWiki
Jump to: navigation, search
Line 30: Line 30:
 
* [[Private:BLTWG membership|working group members (private)]]
 
* [[Private:BLTWG membership|working group members (private)]]
 
* [[Private:main detectors construction milestones|detector construction milestones (private)]]
 
* [[Private:main detectors construction milestones|detector construction milestones (private)]]
* [[Private:Photon Beam and Tagger Instrumentation Paper (2010)|Photon beam and tagger instrumentation paper (2010)]]
+
* [[Private:Photon Beam and Tagger Instrumentation Paper (2010)|photon beam and tagger instrumentation paper (2010)]]
 
* [http://zeus.phys.uconn.edu/halld/tagger/sow-5-2010/Hall-D%20Tagger%20Dipole%20Magnet%20Specification%204-19-2010.pdf Statement of Work for tagger procurement (2010)]
 
* [http://zeus.phys.uconn.edu/halld/tagger/sow-5-2010/Hall-D%20Tagger%20Dipole%20Magnet%20Specification%204-19-2010.pdf Statement of Work for tagger procurement (2010)]
 
* [[Private:Construction contracts | construction contracts and related info (private)]]
 
* [[Private:Construction contracts | construction contracts and related info (private)]]
 +
* [[Discussion of e+/e- tertiary beams in Hall D]]
 
<br>
 
<br>
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]

Revision as of 12:34, 31 October 2012

Design requirements
Spectrometers
Instrumentation
Radiator System
Photon beam pipe
Collimation system
Sweep Magnet 1
Shielding and radiation doses
Sweep magnet 2
Beam simulations

This is the central reporting page for the
GlueX Tagged Photon Beam Working Group