Difference between revisions of "Photon Beam"
From GlueXWiki
Line 40: | Line 40: | ||
** [http://gryphn.phys.uconn.edu/halld/tagger/interfaces/ICD_Accelerator-HallD_04.pdf Accelerator - Hall D Interface Document (draft - 2008)] | ** [http://gryphn.phys.uconn.edu/halld/tagger/interfaces/ICD_Accelerator-HallD_04.pdf Accelerator - Hall D Interface Document (draft - 2008)] | ||
** [http://www.jlab.org/MEgroup/12GeVacc3.html Accelerator Songsheets]: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger | ** [http://www.jlab.org/MEgroup/12GeVacc3.html Accelerator Songsheets]: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger | ||
+ | ** [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/interface_pages/beamline_drawings.asp Links to Accelerator Beamline Drawings] | ||
* [[Tagged Beam Group Engineering Drawings|engineering drawings]] | * [[Tagged Beam Group Engineering Drawings|engineering drawings]] | ||
* [[Diamond Radiator Assessment with X-rays|diamond radiator assessment]] | * [[Diamond Radiator Assessment with X-rays|diamond radiator assessment]] |
Revision as of 17:53, 3 April 2014
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- detector construction milestones (private)
- photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)
- construction contracts and related info (private)
- discussion of e+/e- tertiary beams in Hall D
- Racks location in the Tagger Hall
- Accelerator:
- Accelerator - Hall D Interface Document (draft - 2008)
- Accelerator Songsheets: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
- Links to Accelerator Beamline Drawings
- engineering drawings
- diamond radiator assessment
- microscope readout cable lengths and routes
- alignment and calibration
- Beam Commissioning Plan