Difference between revisions of "Photon Beam"

From GlueXWiki
Jump to: navigation, search
Line 25: Line 25:
 
<u>GlueX Tagged Photon Beam Working Group</u></big>
 
<u>GlueX Tagged Photon Beam Working Group</u></big>
  
 
+
==Working Group Information==
 
* [[Tagged Beam Group Biweekly Meetings|group meetings]]
 
* [[Tagged Beam Group Biweekly Meetings|group meetings]]
 
* [mailto:halld-tagger@jlab.org send email to group list]
 
* [mailto:halld-tagger@jlab.org send email to group list]
Line 31: Line 31:
 
* [[Private:BLTWG membership|working group members (private)]]
 
* [[Private:BLTWG membership|working group members (private)]]
 
* [[rack locations in the tagger hall]]
 
* [[rack locations in the tagger hall]]
<br>
 
* Accelerator:
 
** [http://gryphn.phys.uconn.edu/halld/tagger/interfaces/ICD_Accelerator-HallD_04.pdf Accelerator - Hall D Interface Document (draft - 2008)]
 
** [http://www.jlab.org/MEgroup/12GeVacc3.html Accelerator Songsheets]: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
 
** [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/interface_pages/beamline_drawings.asp Links to Accelerator Beamline Drawings]
 
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]
 
* [[Tagged Beam Group Engineering Drawings|engineering drawings]]
* [[Diamond Radiator Assessment with X-rays|diamond radiator assessment]]
 
 
* [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]]
 
* [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]]
 
* [[Alignment and Calibration|alignment and calibration]]
 
* [[Alignment and Calibration|alignment and calibration]]
 
* [[Beam Commissioning Plan]]
 
* [[Beam Commissioning Plan]]
 +
 +
==Accelerator Information==
 +
* [http://gryphn.phys.uconn.edu/halld/tagger/interfaces/ICD_Accelerator-HallD_04.pdf Accelerator - Hall D Interface Document (draft - 2008)]
 +
* [http://www.jlab.org/MEgroup/12GeVacc3.html Accelerator Songsheets]: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
 +
* [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/interface_pages/beamline_drawings.asp Links to Accelerator Beamline Drawings]
 +
 
<br>
 
<br>
 
* [[Tagger_and_Beamline_Working_Group_Archives|archived pages]]
 
* [[Tagger_and_Beamline_Working_Group_Archives|archived pages]]

Revision as of 11:10, 23 June 2014

Design requirements
Spectrometers
Instrumentation
Radiator System
Photon beam pipe
Collimation system
Sweep Magnet 1
Shielding and radiation doses
Sweep magnet 2
Beam simulations

This is the central reporting page for the
GlueX Tagged Photon Beam Working Group

Working Group Information

Accelerator Information