Photon Beam Commissioning Discussion July 7, 2014

From GlueXWiki
Revision as of 09:16, 10 July 2014 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
  3. Photon Commissioning Draft (Eugene)
  4. Goals for Aug 8 Review
  5. Other business

Minutes

  • Attending: Elton, Eugene, Alexandre, Sasha (Hall D); Mike McCaughan, Todd Satogata (Accelerator); Richard (UConn); Curtis (CMU).
  1. Announcements
  2. Electron Commissioning (Todd/Mike)
    1. Mike detailing procedures for commissioning electron beam based on experience in April
      • Much learned from beam delivery
      • Confidence that delivery this fall will be clearner
      • Expect: days to tune after spinning up to 5.5 pass; reasonable radiation without radiator
      • Initial goal for emittance is 20 nm*rad x 2. [Design is 25 nm*rad in x and 10 nm*rad in y]
      • Setup beam so that virtual focus of electron beam is at the collimator
      • Need to characterize the ion chambers (minimizing scrapping and tails)
      • nAmp bpms should be installed, but operation is not needed for commissioning
      • Fast feedback is also not critical
    2. Simulation of beam environment
      • Richard will provide a geometry for Todd to run simulations
      • Richard will include the mapped tagger magnetic field
      • Todd will provide a magnetic field for the quad immediately upstream of the tagger magnet.
      • (Eugene) Suggest to have the quad off during initial commissioning.
    3. Radiators
      • Production radiators are (10^-5, 3x10^-4, 10^-3)
      • Propose the following set for commissioning: (3x10^-5, 10^-4, 3x10^-4)
  3. Photon Commissioning Draft (Eugene)
    1. Discussion of draft plan submitted as homework to ERR
  4. Goals for Aug 8 Review
  5. Other business