Difference between revisions of "Photon Beam Commissioning Discussion Oct 15, 2014"

From GlueXWiki
Jump to: navigation, search
(Action Items)
(Agenda)
Line 24: Line 24:
 
# [[Beam Simulations]]
 
# [[Beam Simulations]]
 
# RadCon update
 
# RadCon update
 +
#* Checklists
 
# Other business
 
# Other business
  
 
== Minutes ==
 
== Minutes ==
 
"Attending:
 
"Attending:

Revision as of 11:42, 14 October 2014

Organization

  • Time: 4:00 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)

Agenda

  1. Announcements
  2. ARR3 Recommendations
  3. Accelerator and Hall D Interface Document - update
  4. Update on Photon Commissioning (Alexandre)
  5. Beam Simulations
  6. RadCon update
    • Checklists
  7. Other business

Minutes

"Attending: