# Announcements
 
# Announcements
 
# ARR3 Recommendations
 
# ARR3 Recommendations
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/ARR3_Aug2014/ARR_Phase_3_Report_Aug_2014.pdf ARR3 Report]
+
#* All recommendations complete and request for operation has been sent to Patrizia
 
# Accelerator and Hall D Interface Document - update
 
# Accelerator and Hall D Interface Document - update
 
# Update on Photon Commissioning (Alexandre)
 
# Update on Photon Commissioning (Alexandre)

Revision as of 07:26, 15 October 2014

Organization

  • Time: 4:00 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)

Agenda

  1. Announcements
  2. ARR3 Recommendations
    • All recommendations complete and request for operation has been sent to Patrizia
  3. Accelerator and Hall D Interface Document - update
  4. Update on Photon Commissioning (Alexandre)
  5. Beam Simulations
  6. RadCon update
    • Checklists
  7. Other business