"Attending:
+
"Attending: Elton, Beni, Alexandre, Hovanes, Eugene (Hall D); Todd (CASA); Pavel (RadCon); Curtis (CMU); Richard (UConn).
 +
 
 +
# Announcements
 +
#* Accelerator Schedule:
 +
# ARR3 Recommendations
 +
#* All recommendations complete and request for operation has been sent to Patrizia
 +
# Accelerator and Hall D Interface Document - update
 +
# Update on Photon Commissioning (Alexandre)
 +
# [[Beam Simulations]]
 +
# RadCon update
 +
#* Checklists
 +
# Other business

Revision as of 16:59, 15 October 2014

Organization

  • Time: 4:00 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)

Agenda

  1. Announcements
  2. ARR3 Recommendations
    • All recommendations complete and request for operation has been sent to Patrizia
  3. Accelerator and Hall D Interface Document - update
  4. Update on Photon Commissioning (Alexandre)
  5. Beam Simulations
  6. RadCon update
    • Checklists
  7. Other business

Minutes

"Attending: Elton, Beni, Alexandre, Hovanes, Eugene (Hall D); Todd (CASA); Pavel (RadCon); Curtis (CMU); Richard (UConn).

  1. Announcements
    • Accelerator Schedule:
  2. ARR3 Recommendations
    • All recommendations complete and request for operation has been sent to Patrizia
  3. Accelerator and Hall D Interface Document - update
  4. Update on Photon Commissioning (Alexandre)
  5. Beam Simulations
  6. RadCon update
    • Checklists
  7. Other business