Line 41: Line 41:
 
#* small changes to the plan are being implemented including the last links
 
#* small changes to the plan are being implemented including the last links
 
#* Tentative proposal to start shifts: standby shifts on Tue evening/night, start regular shifts on Wed day shift
 
#* Tentative proposal to start shifts: standby shifts on Tue evening/night, start regular shifts on Wed day shift
 +
#* Observers in the MCC are welcome during the electron beam tune. Todd suggests that the visits be coordinated with him and Michael. Todd will communicate with Alexandre.
 +
#* Use of the nAmp bpms will start Monday by Trent. Feedback can be useful to him.
 +
#* Discussion of various variable information being made available to accelerator screens. Ion chambers are currently blank on Hall D pages.
 +
#* Alexandre will send the variable names to Pavel. Pavel will also make available a list of RadCon lists that may be useful to Hall D
 
#* Need to take baseline rates of profile monitor before commissioning starts. Hovanes will do this.
 
#* Need to take baseline rates of profile monitor before commissioning starts. Hovanes will do this.
#* Eugene: Need checklists before starting various plans. Alexandre: There are checklists for the electron beam and photon beam separately  
+
#* Eugene: Need checklists before starting various plans. Alexandre: There are checklists for the electron beam and photon beam separately. We will go over them during the 8:45 meeting tomorrow or Friday.
 
# [[Beam Simulations]]
 
# [[Beam Simulations]]
 +
#* Todd: GEANT now up and running on old laptop, but simulations have not started yet
 +
#* Pavel: Getting ready to run the simulations. Could do this by enhancing the neutron production by a factor of 50. If not sufficient to get enough statistics, he may work with Richard to run jobs on the OSG.
 
# RadCon update
 
# RadCon update
 
#* Note: shielding is being added to the gap in the wall nearest to the dump by Tom's crew
 
#* Note: shielding is being added to the gap in the wall nearest to the dump by Tom's crew
 +
#* RadCon Checklists has a complete list of information that they are responsible for.
 +
#* All monitors are in this list, in particular all in the FSD, but not yet made it into the HCO system
 +
#* Pavel will monitor them and check that they are all operational
 
#* Checklists
 
#* Checklists
 
# Other business
 
# Other business
 +
## This is the last meeting in this series. The content will be transferred to other meetings as appropriate.
 +
## Beni: Are the goals for accelerator to deliver "quality electron beam" to Hall D defined? Todd: Yes, there are goals to be met and submitted as work plans to ATLIS.
 +
## Richard: Preparation for active collimator commissioning.
 +
##* Need to develop software visualization of data to understand the active collimator
 +
##* Hovanes: Trent and Alex have waveforms, as well as FFTs of the waveforms.
 +
##* Yi: Analysis of elements into ROOT for manipulation
 +
##* Data also include integrated waveforms over one second, which may be useful
 +
## Alexandre: Can Richard come to JLab for the commissioning of the active collimator? At the moment, it seems this will happen either Thursday or Friday. Richard will investigate schedules.

Latest revision as of 10:48, 17 October 2014

Organization

  • Time: 4:00 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)

Agenda

  1. Announcements
  2. ARR3 Recommendations
    • All recommendations complete and request for operation has been sent to Patrizia
  3. Accelerator and Hall D Interface Document - update
  4. Update on Photon Commissioning (Alexandre)
  5. Beam Simulations
  6. RadCon update
    • Checklists
  7. Other business

Minutes

"Attending: Elton, Beni, Alexandre, Hovanes, Eugene (Hall D); Todd (CASA); Pavel (RadCon); Curtis (CMU); Richard (UConn).

  1. Announcements
    • Accelerator Schedule: Weekend: beam to dumplet, Monday morning: lock up Hall D/tagger, evening tune beam to dump, Tuesday: CW to tagger dump, Wed morning: insert radiator
  2. ARR3 Recommendations
    • All recommendations complete and request for operation has been sent to Patrizia
    • Final documentation on the completion of items needed for Javier.
    • RadCon will tag the completed shielding in the tagger area with a plaque. The completion will be confirmed to Eugene
    • Fanning has sent a confirmation of all safety items checked during the walkthrough last Thursday
  3. Accelerator and Hall D Interface Document - update
  4. Update on Photon Commissioning (Alexandre)
    • small changes to the plan are being implemented including the last links
    • Tentative proposal to start shifts: standby shifts on Tue evening/night, start regular shifts on Wed day shift
    • Observers in the MCC are welcome during the electron beam tune. Todd suggests that the visits be coordinated with him and Michael. Todd will communicate with Alexandre.
    • Use of the nAmp bpms will start Monday by Trent. Feedback can be useful to him.
    • Discussion of various variable information being made available to accelerator screens. Ion chambers are currently blank on Hall D pages.
    • Alexandre will send the variable names to Pavel. Pavel will also make available a list of RadCon lists that may be useful to Hall D
    • Need to take baseline rates of profile monitor before commissioning starts. Hovanes will do this.
    • Eugene: Need checklists before starting various plans. Alexandre: There are checklists for the electron beam and photon beam separately. We will go over them during the 8:45 meeting tomorrow or Friday.
  5. Beam Simulations
    • Todd: GEANT now up and running on old laptop, but simulations have not started yet
    • Pavel: Getting ready to run the simulations. Could do this by enhancing the neutron production by a factor of 50. If not sufficient to get enough statistics, he may work with Richard to run jobs on the OSG.
  6. RadCon update
    • Note: shielding is being added to the gap in the wall nearest to the dump by Tom's crew
    • RadCon Checklists has a complete list of information that they are responsible for.
    • All monitors are in this list, in particular all in the FSD, but not yet made it into the HCO system
    • Pavel will monitor them and check that they are all operational
    • Checklists
  7. Other business
    1. This is the last meeting in this series. The content will be transferred to other meetings as appropriate.
    2. Beni: Are the goals for accelerator to deliver "quality electron beam" to Hall D defined? Todd: Yes, there are goals to be met and submitted as work plans to ATLIS.
    3. Richard: Preparation for active collimator commissioning.
      • Need to develop software visualization of data to understand the active collimator
      • Hovanes: Trent and Alex have waveforms, as well as FFTs of the waveforms.
      • Yi: Analysis of elements into ROOT for manipulation
      • Data also include integrated waveforms over one second, which may be useful
    4. Alexandre: Can Richard come to JLab for the commissioning of the active collimator? At the moment, it seems this will happen either Thursday or Friday. Richard will investigate schedules.