This page contains a list of to do items for installing the triplet polarimeter for the Spring 2015 GlueX run.
 +
Items that used to be on this page are now at the bottom in [[#Items From Before January 2015 | Items From Before January 2015]]
 +
 +
== Expected Timeline ==
 +
* February 2 - 5: (?) Kei visits ASU
 +
* mid-February ship: triplet to JLab
 +
* First week after delivery: Survey by JLab
 +
* February 16 - March 27: installation
 +
* March 28 - April 2: testing
 +
* April 3 - May 4: physics beam
 +
 +
== Hardware Division ==
 +
* ASU
 +
** motor
 +
** HV supply
 +
* JLab
 +
** cables
 +
 +
== Things to do at ASU ==
 +
* packaging, shipping
 +
 +
== Things to do at JLab ==
 +
* preparation of cables
 +
* installation
 +
 +
== Management/Safety ==
 +
* write proposal, safety concerns/procedures
 +
* Get approval from Bert
 +
* Pass by Patritzia
 +
 +
== Analysis Procedures ==
 +
* beam requirements
 +
* requirements on other systems (PS, tagger)
 +
* analysis procedure
 +
* online monitoring
 +
* MC (GEANT?)
 +
 +
== Items From Before January 2015 ==
 
* [[Polarimeter_11_01_2010 | Studies of some direct photon polarimetry possibility for the meeting on November 1, 2010]]
 
* [[Polarimeter_11_01_2010 | Studies of some direct photon polarimetry possibility for the meeting on November 1, 2010]]
 
* [[Polarimeter_01_10_2011 | Azimuthal asymmetries from Geant4 polarized pair production on January 10, 2011]]
 
* [[Polarimeter_01_10_2011 | Azimuthal asymmetries from Geant4 polarized pair production on January 10, 2011]]

Revision as of 12:58, 8 January 2015

This page contains a list of to do items for installing the triplet polarimeter for the Spring 2015 GlueX run. Items that used to be on this page are now at the bottom in Items From Before January 2015

Expected Timeline

  • February 2 - 5: (?) Kei visits ASU
  • mid-February ship: triplet to JLab
  • First week after delivery: Survey by JLab
  • February 16 - March 27: installation
  • March 28 - April 2: testing
  • April 3 - May 4: physics beam

Hardware Division

  • ASU
    • motor
    • HV supply
  • JLab
    • cables

Things to do at ASU

  • packaging, shipping

Things to do at JLab

  • preparation of cables
  • installation

Management/Safety

  • write proposal, safety concerns/procedures
  • Get approval from Bert
  • Pass by Patritzia

Analysis Procedures

  • beam requirements
  • requirements on other systems (PS, tagger)
  • analysis procedure
  • online monitoring
  • MC (GEANT?)

Items From Before January 2015