Difference between revisions of "Photon Beam Polarimetry"

From GlueXWiki
Jump to: navigation, search
(Management/Safety)
(Management/Safety)
Line 46: Line 46:
 
** [http://www.public.asu.edu/~kmoriya/triplet/D00000-10-05-P001%20Beamline%20Vacuum%20Procedures.pdf Hall D Beam Line Vacuum Procedures document] (PDF) - reuse (?) → Tim
 
** [http://www.public.asu.edu/~kmoriya/triplet/D00000-10-05-P001%20Beamline%20Vacuum%20Procedures.pdf Hall D Beam Line Vacuum Procedures document] (PDF) - reuse (?) → Tim
 
** example document for [http://www.public.asu.edu/~kmoriya/triplet/3210T1Form_FCAL_Dark_Room.doc FCAL Hazard Analysis] (DOC)
 
** example document for [http://www.public.asu.edu/~kmoriya/triplet/3210T1Form_FCAL_Dark_Room.doc FCAL Hazard Analysis] (DOC)
 +
* Beryllium use:
 +
** will be used as radiator foil, 25μm thick
 
* Get approval from Bert
 
* Get approval from Bert
 
* Pass by Patritzia
 
* Pass by Patritzia

Revision as of 12:26, 12 January 2015

This page contains a list of to do items for installing the triplet polarimeter for the Spring 2015 GlueX run. Items that used to be on this page are now at the bottom in Items From Before January 2015

Expected Timeline

  • February 2 - 5 (?): Kei visits ASU
  • mid-February: ship triplet to JLab
  • First week after delivery: Survey by JLab
  • February 16 - March 27: installation
  • March 28 - April 2: testing
  • April 3 - May 4: physics beam

Hardware Division

  • ASU
    • motor (data sheet)
    • controller
    • power supply
      1. 4 channels of +12V, 0.21 amps per channel
      2. 4 channels of -12V, 0.21 amps per channel
      3. 1 channel of +200V, the leakage current on the silicon strip detecter is 3.3 micro-amps
    • 32 short SSI cables with Lemo
    • vacuum rated limit switches (data sheet)
  • JLab
    • fADCs
      1. 2 fADC250s on PSC VXS crate
    • 32 coax cables with Lemos on both ends (Fernando). Require 55ft to racks
    • turbo vacuum pump (Tim)

Things to do at ASU

  • packaging, shipping
  • testing(?)

Things to do at JLab

  • preparation of hardware before shipment
  • installation
  • Monitoring
    • Would like to run the device below 50 mTorr to avoid voltage breakdown. Need pressure sensor, monitoring (Note: this is being extremely cautious. We will be running at ~200V, and even with 300V the required pressure is, given d = 1mm, <6Torr)
    • Humidity: no requirements
    • Temperature: would like to monitor temperature in collimator cave since we don't want the preamps to get too hot. Need temperature sensor, monitoring
  • testing with source(?)

Management/Safety

Analysis Procedures

  • beam requirements
  • requirements on other systems (PS, tagger)
  • analysis procedure
  • online monitoring
  • MC - GEANT4 simulation available with previous geometry

Items From Before January 2015