Difference between revisions of "Photon beam pipe"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
Machine interface document draft 1
 
  
 +
Machine interface document draft 2
 +
[[Media:ICD_Accelerator-HallD_04.doc |ICD_Accelerator-HallD_04.doc]]
 +
 +
 +
 +
Machine interface document draft 1
 
[[Media:ICD_Accelerator-HallD_03.doc |ICD_Accelerator-HallD_03.doc]]
 
[[Media:ICD_Accelerator-HallD_03.doc |ICD_Accelerator-HallD_03.doc]]
  

Revision as of 11:00, 9 June 2008

Machine interface document draft 2 ICD_Accelerator-HallD_04.doc


Machine interface document draft 1 ICD_Accelerator-HallD_03.doc


Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall. File:Beamline-BSize Layout.TIF



The plans by the accelerator are summarized in their song-sheet. It can be found here

Tagger hall songsheet version March 26 2008


Return to Photon Beam Main Page

Return to Hall-D WIKI main page