Difference between revisions of "Photon beam pipe"

From GlueXWiki
Jump to: navigation, search
Line 16: Line 16:
  
 
----
 
----
 +
===Machine Group Songsheet for the Tagger Hall===
 
The plans by the accelerator are summarized in their song-sheet. It can be found here
 
The plans by the accelerator are summarized in their song-sheet. It can be found here
  

Revision as of 11:13, 9 June 2008

Machine interface Documents

Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc


Machine interface document draft 3 ICD_Accelerator-HallD_03.doc


Photon beamline between tagger and West Wall

Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall. File:Beamline-BSize Layout.TIF



Machine Group Songsheet for the Tagger Hall

The plans by the accelerator are summarized in their song-sheet. It can be found here

Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif


Return to Photon Beam Main Page

Return to Hall-D WIKI main page