Difference between revisions of "Photon beam pipe"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
  
 
----
 
----
 +
== Tagger Hall Vacuum System ==
 +
=== Tagger hall vacuum layout ===
 +
[[Image:pumpstand.jpg|500px]]<br>
 +
Schematic overview of the tagger hall vacuum system
  
==Photon beamline between tagger and West Wall ==
+
===Photon beamline between tagger and West Wall ===
  
 
Sketch of the photon beamline between the tagger magnet and the West wall of the  
 
Sketch of the photon beamline between the tagger magnet and the West wall of the  

Revision as of 15:06, 19 August 2008

Machine interface Documents

Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc


Machine interface document draft 3 ICD_Accelerator-HallD_03.doc


Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008


Tagger Hall Vacuum System

Tagger hall vacuum layout

Pumpstand.jpg
Schematic overview of the tagger hall vacuum system

Photon beamline between tagger and West Wall

Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall.

File:Beamline-BSize Layout.TIF



Machine Group Songsheet for the Tagger Hall

The plans by the accelerator are summarized in their song-sheet. It can be found here

Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif


Return to Photon Beam Main Page

Return to Hall-D WIKI main page