Photon beam pipe

From GlueXWiki
Revision as of 11:10, 16 September 2008 by Jstewart (Talk | contribs) (Collimator Cave)

Jump to: navigation, search

Machine interface Documents

Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc


Machine interface document draft 3 ICD_Accelerator-HallD_03.doc


Machine Group Songsheet for the Tagger Hall

The plans by the accelerator are summarized in their song-sheet. It can be found here

Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif



Tagger Hall Vacuum System

Tagger hall vacuum layout

Pumpstand.jpg
Schematic overview of the tagger hall vacuum system

Photon beamline between tagger and West Wall

Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall.

File:Beamline-BSize Layout.TIF




Collimator Cave

Pictures of the collimator cave

Upstream region of the collimator cave

Side View CollimatorElevationUpstreamSept08.png


Top View CollimatorTopUpstreamSept08.png



Central area of the collimator cave

Side View CollimatorElevationDownstreamSept08.png


Top View 750px




Upstream region of the collimator cave

Side View CollimatorElevationUpstreamSept08.png


Top View CollimatorTopUpstreamSept08.png



Older design versions

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008

Collimator Cave Isometric Jul 18, 2008 - July 18, 2008


Construction and Installation Schedules

Installation schedule for the cave extension Cave extension fasttrack file


Return to Photon Beam Main Page

Return to Hall-D WIKI main page