Line 8: Line 8:
  
 
8:00 - 9:00      Executive Session
 
8:00 - 9:00      Executive Session
 +
 
9:00 - 9:30      Introduction and Physics Overview
 
9:00 - 9:30      Introduction and Physics Overview
 +
 
9:30 - 10:30    DIRC Project Overview
 
9:30 - 10:30    DIRC Project Overview
 +
 
10:30 - 10:45  Break
 
10:30 - 10:45  Break
 +
 
10:45 - 11:15  Focusing Box Prototype Studies
 
10:45 - 11:15  Focusing Box Prototype Studies
 +
 
11:15 - 11:45  Mechanical Design and Integration
 
11:15 - 11:45  Mechanical Design and Integration
 +
 
11:45 - 12:15  Bar Box Transport to JLab
 
11:45 - 12:15  Bar Box Transport to JLab
 +
 
12:15 - 2: 30  Lunch (Executive Session)
 
12:15 - 2: 30  Lunch (Executive Session)
 +
 
2:30 - 3:00      Photon Detection and Readout  
 
2:30 - 3:00      Photon Detection and Readout  
 +
 
3:00 - 4:00      Project Management, Cost, and Schedule
 
3:00 - 4:00      Project Management, Cost, and Schedule
 +
 
4:00 - 6:00      Executive Session and Closeout
 
4:00 - 6:00      Executive Session and Closeout
  

Revision as of 12:13, 18 August 2015

Meeting Information

GlueX DIRC Review Meeting
October, 14 2015

Preliminary Agenda

8:00 - 9:00 Executive Session

9:00 - 9:30 Introduction and Physics Overview

9:30 - 10:30 DIRC Project Overview

10:30 - 10:45 Break

10:45 - 11:15 Focusing Box Prototype Studies

11:15 - 11:45 Mechanical Design and Integration

11:45 - 12:15 Bar Box Transport to JLab

12:15 - 2: 30 Lunch (Executive Session)

2:30 - 3:00 Photon Detection and Readout

3:00 - 4:00 Project Management, Cost, and Schedule

4:00 - 6:00 Executive Session and Closeout

TDR preparation schedule

  • October 14: External review at JLab
  • October 7: Dry runs of talks at JLab
  • September 30: Submit final TDR to external committee
  • September 23: Submit draft TDR to collaboration for review
  • September 7: Receive feedback from internal committee's review of TDR
  • August 21: Submit draft TDR to internal committee for review
  • August 14: Complete drafts of all TDR sections
  • Early July: First draft of all TDR sections
  • Early June: Complete outline of TDR sections

Documents

  • SVN repository for TDR
  • Eventually will link to relevant document(s) on DocDB
    • LHCb Paper on Multianode PMT arXiv.
  • Talks for review in DocDB
  • etc.

Previous Documentation