Difference between revisions of "Planning for 2015 DIRC Review"

From GlueXWiki
Jump to: navigation, search
(Preliminary Agenda)
Line 7: Line 7:
 
== Preliminary Agenda ==
 
== Preliminary Agenda ==
  
8:00 - 9:00      Executive Session
+
*8:00 - 9:00      Executive Session
 
+
*9:00 - 9:30      Introduction and Physics Overview
9:00 - 9:30      Introduction and Physics Overview
+
*9:30 - 10:30    DIRC Project Overview
 
+
*10:30 - 10:45  Break
9:30 - 10:30    DIRC Project Overview
+
*10:45 - 11:15  Focusing Box and Prototype Studies
 
+
*11:15 - 11:45  Mechanical Design and Integration
10:30 - 10:45  Break
+
*11:45 - 12:15  Bar Box Transport
 
+
*12:15 - 2: 30  Lunch (Executive Session)
10:45 - 11:15  Focusing Box and Prototype Studies
+
*2:30 - 3:00      Photon Detection and Readout  
 
+
*3:00 - 4:00      Project Management, Cost, and Schedule
11:15 - 11:45  Mechanical Design and Integration
+
*4:00 - 6:00      Executive Session and Closeout
 
+
11:45 - 12:15  Bar Box Transport
+
 
+
12:15 - 2: 30  Lunch (Executive Session)
+
 
+
2:30 - 3:00      Photon Detection and Readout  
+
 
+
3:00 - 4:00      Project Management, Cost, and Schedule
+
 
+
4:00 - 6:00      Executive Session and Closeout
+
  
 
== TDR preparation schedule ==
 
== TDR preparation schedule ==

Revision as of 12:25, 18 August 2015

Meeting Information

GlueX DIRC Review Meeting
October, 14 2015

Preliminary Agenda

  • 8:00 - 9:00 Executive Session
  • 9:00 - 9:30 Introduction and Physics Overview
  • 9:30 - 10:30 DIRC Project Overview
  • 10:30 - 10:45 Break
  • 10:45 - 11:15 Focusing Box and Prototype Studies
  • 11:15 - 11:45 Mechanical Design and Integration
  • 11:45 - 12:15 Bar Box Transport
  • 12:15 - 2: 30 Lunch (Executive Session)
  • 2:30 - 3:00 Photon Detection and Readout
  • 3:00 - 4:00 Project Management, Cost, and Schedule
  • 4:00 - 6:00 Executive Session and Closeout

TDR preparation schedule

  • October 14: External review at JLab
  • October 7: Dry runs of talks at JLab
  • September 30: Submit final TDR to external committee
  • September 23: Submit draft TDR to collaboration for review
  • September 7: Receive feedback from internal committee's review of TDR
  • August 21: Submit draft TDR to internal committee for review
  • August 14: Complete drafts of all TDR sections
  • Early July: First draft of all TDR sections
  • Early June: Complete outline of TDR sections

Documents

  • SVN repository for TDR
  • Eventually will link to relevant document(s) on DocDB
    • LHCb Paper on Multianode PMT arXiv.
  • Talks for review in DocDB
  • etc.

Previous Documentation