Line 23: | Line 23: | ||
*11:15 - 11:45 Mechanical Design and Integration | *11:15 - 11:45 Mechanical Design and Integration | ||
** Support structure design and integration with forward carriage | ** Support structure design and integration with forward carriage | ||
+ | ** Reasoning for horizontal (instead of vertical) design | ||
*11:45 - 12:15 Bar Box Transport | *11:45 - 12:15 Bar Box Transport | ||
** Shipping crate design | ** Shipping crate design | ||
− | ** | + | ** Tests with accelerometers at IU on mock bar box |
*12:15 - 2: 30 Lunch (Executive Session) | *12:15 - 2: 30 Lunch (Executive Session) | ||
*2:30 - 3:00 Photon Detection and Readout | *2:30 - 3:00 Photon Detection and Readout | ||
** Summarize requirements for RICH readout and show they're well matched to the DIRC | ** Summarize requirements for RICH readout and show they're well matched to the DIRC | ||
− | ** Describe | + | ** Describe GlueX specific considerations for the readout |
*3:00 - 4:00 Project Management, Cost, and Schedule | *3:00 - 4:00 Project Management, Cost, and Schedule | ||
** Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc. | ** Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc. |
Revision as of 13:33, 18 August 2015
Contents
Meeting Information
GlueX DIRC Review Meeting
October, 14 2015
Preliminary Agenda
- 8:00 - 9:00 Executive Session
- 9:00 - 9:30 Introduction and Physics Overview
- Meson spectroscopy introduction with focus on strange final states
- Kaon ID limitations with baseline GlueX
- Overview of GlueX run plan
- 9:30 - 10:30 DIRC Project Overview
- Review of BaBar design and SLAC FDIRC prototype
- General overview of design, referring to later talks for specifics
- Evaluation of design based on John's simulation
- 10:30 - 10:45 Break
- 10:45 - 11:15 Focusing Box Prototype Studies
- Overview of prototype design
- John's test setup at Bates and mirror characterization
- Plans for full scale box design
- 11:15 - 11:45 Mechanical Design and Integration
- Support structure design and integration with forward carriage
- Reasoning for horizontal (instead of vertical) design
- 11:45 - 12:15 Bar Box Transport
- Shipping crate design
- Tests with accelerometers at IU on mock bar box
- 12:15 - 2: 30 Lunch (Executive Session)
- 2:30 - 3:00 Photon Detection and Readout
- Summarize requirements for RICH readout and show they're well matched to the DIRC
- Describe GlueX specific considerations for the readout
- 3:00 - 4:00 Project Management, Cost, and Schedule
- Similar to Patrizia's talk for CLAS12 review: management structure, contingencies, cost/schedule in gantt chart, etc.
- 4:00 - 6:00 Executive Session and Closeout
TDR preparation schedule
- October 14: External review at JLab
- October 7: Dry runs of talks at JLab
- September 30: Submit final TDR to external committee
- September 23: Submit draft TDR to collaboration for review
- September 7: Receive feedback from internal committee's review of TDR
- August 21: Submit draft TDR to internal committee for review
- August 14: Complete drafts of all TDR sections
- Early July: First draft of all TDR sections
- Early June: Complete outline of TDR sections
Documents
- SVN repository for TDR
- Eventually will link to relevant document(s) on DocDB
- LHCb Paper on Multianode PMT arXiv.
- Talks for review in DocDB
- etc.