Difference between revisions of "Primex Spring 2019 Reconstruction"

From GlueXWiki
Jump to: navigation, search
(Calibration/Reconstruction tasks)
(Calibration/Reconstruction tasks)
Line 7: Line 7:
 
# CCAL channel timing
 
# CCAL channel timing
 
#* look at correlation of FCAL shower time with CCAL hit times for compton events
 
#* look at correlation of FCAL shower time with CCAL hit times for compton events
 +
#* Add timing cuts into shower reconstruction
 
# Add in gain non-linearity corrections
 
# Add in gain non-linearity corrections
 
# slowly make as many variables local as possible in the shower factory =)
 
# slowly make as many variables local as possible in the shower factory =)

Revision as of 17:09, 27 February 2019

Calibration/Reconstruction tasks

  1. monitoring
    • commit plugin & monitoring macros to github, notify David Lawrence and Alex Austregesilo
  2. CCAL channel timing
    • look at correlation of FCAL shower time with CCAL hit times for compton events
    • Add timing cuts into shower reconstruction
  3. Add in gain non-linearity corrections
  4. slowly make as many variables local as possible in the shower factory =)

Compton analysis suggestions

  • improve timing cuts
  • tagger accidental subtraction