Difference between revisions of "Private:Trigger Types"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
   Run stand alone DAC for each sub-detector
 
   Run stand alone DAC for each sub-detector
 
*
 
*
 
 
 
 
# Final Detector installation
 
# Final Detector installation
  

Revision as of 09:25, 2 August 2013

The main activities can be organized into three main phases:

  1. Initial installation phase, where only a few crates with electronics are installed and connected to the sub-detector.
 Run stand alone DAC for each sub-detector
  1. Final Detector installation
  1. Detector Calibration with the Beam

Phase I