(FCAL crates after rearranging cables)
Line 55: Line 55:
 
Image:d2_6_top_fcal7_recable.jpg  | Fig. 3 D2-6-TOP (FCAL 7) install one flash ADC in slot 19 (ACDI-830), connect 4 cables
 
Image:d2_6_top_fcal7_recable.jpg  | Fig. 3 D2-6-TOP (FCAL 7) install one flash ADC in slot 19 (ACDI-830), connect 4 cables
 
</gallery>
 
</gallery>
 +
 +
[https://logbooks.jlab.org/entry/4165517 Newly installed flash ADCs]

Revision as of 18:17, 6 August 2023

Calorimeter Layout

VXS crate layout

VXS crates connected to the FCAL2 insert region

  • Blue region corresponds to ADC channels connected to the FCAL2 insert region (21x21 lead glass modules). Yellow boxes correspond to channels connected to the region outside the insert.
  • 108 ADC channels in each of four crates are connected to the insert region
  • 238 ADC channels are used in each crate

Possible rearranging of cables

  • Move 108 channels from the rocfcal2 (rocfcal8) crate connected to the insert to the rocfcal5 (rocfcal11) crate. The total number of channels in this crate: 108 + 108 = 216 (connect to 14 FADCs), see Fig. 1
  • Move 126 channels in the rocfcal5 (rocfcal11) crate connected to the insert to the rocfcal2 (rocfcal8) crate. The total number of channels in this crate: 130 (remaining) + 126 = 256 (connect to 16 FADCs), see Fig. 2. Connect 4 remaining cables to other crates, see Fig. 3

FCAL crates after rearranging cables

North side

South side