Difference between revisions of "Requirements for Controls Systems from various detector components"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
  
 
# Readout and monitoring of temperature sensors  
 
# Readout and monitoring of temperature sensors  
#* Estimated  ~10 channels (from Elton)  
+
#* Estimated  ~10 input channels (from Elton)  
 
# Control of 70V Bias LV channels on SiPMs
 
# Control of 70V Bias LV channels on SiPMs
 
#* Estimated 18 channels ?????
 
#* Estimated 18 channels ?????
Line 20: Line 20:
  
 
# Readout and monitoring of of temperature sensors :
 
# Readout and monitoring of of temperature sensors :
#* Estimated  ~10 channels (from Lubomir and Beni)  
+
#* Estimated  ~10 input channels (from Lubomir and Beni)  
 
# Control of HV channels
 
# Control of HV channels
 
#* Estimated ~192 channels (from Fernando's table)
 
#* Estimated ~192 channels (from Fernando's table)
 
#Control of LV on preamp cards
 
#Control of LV on preamp cards
 
#* Estimated 192 channels ????
 
#* Estimated 192 channels ????

Revision as of 10:59, 8 December 2010

BCAL

  1. Readout and monitoring of temperature sensors
    • Estimated ~10 input channels (from Elton)
  2. Control of 70V Bias LV channels on SiPMs
    • Estimated 18 channels ?????
  3. Control of 5 V LV on amplifiers
    • Estimated 12 channels ??????


FCAL

  1. Control of HV on CW PMTs (IU is taking care of most of this)
    • Estimated 2800 channels (from Matt)
  2. Control and monitor thresholds
    • Estimated 2800 channels (from Matt)


FDC

  1. Readout and monitoring of of temperature sensors :
    • Estimated ~10 input channels (from Lubomir and Beni)
  2. Control of HV channels
    • Estimated ~192 channels (from Fernando's table)
  3. Control of LV on preamp cards
    • Estimated 192 channels ????