Difference between revisions of "Reviews"
From GlueXWiki
(→[http://www.jlab.org/Hall-D/reviews/ Public Review Site]) |
|||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
== [http://www.jlab.org/Hall-D/halld_secure/reviews/ Hall D Review Site] == | == [http://www.jlab.org/Hall-D/halld_secure/reviews/ Hall D Review Site] == | ||
+ | |||
+ | == GlueX/HallD Reviews in 2010 == | ||
+ | |||
+ | * [http://www.jlab.org/Hall-D/reviews/Tagger_Magnet_Design_Review_July09 Tagger Magnet Review] (July 10, 2009) | ||
+ | * [[BCAL Readout Review]] | ||
+ | |||
== GlueX/HallD Reviews in 2009 == | == GlueX/HallD Reviews in 2009 == | ||
+ | * [[Nov 3-5, 2009 Calorimetry | Bcal Fabrication Readiness Review at Regina]] (Nov 3-5, 2009) | ||
* [http://www.jlab.org/Hall-D/reviews/Tagger_Magnet_Design_Review_July09 Tagger Magnet Review] (July 10, 2009) | * [http://www.jlab.org/Hall-D/reviews/Tagger_Magnet_Design_Review_July09 Tagger Magnet Review] (July 10, 2009) | ||
* [[BCAL Readout Review]] | * [[BCAL Readout Review]] |
Revision as of 11:51, 3 March 2010
Contents
Hall D Review Site
GlueX/HallD Reviews in 2010
- Tagger Magnet Review (July 10, 2009)
- BCAL Readout Review
GlueX/HallD Reviews in 2009
- Bcal Fabrication Readiness Review at Regina (Nov 3-5, 2009)
- Tagger Magnet Review (July 10, 2009)
- BCAL Readout Review
GlueX/HallD Reviews in 2008
- [FDC Technology Review] (February 1, 2008)
- Calorimeter Review (February 19-20, 2008)
- Drift Chamber and PID Review (March 27-28, 2008)
- Subsystems Review (May 7-9, 2008)
- The Lehman Review (July 2008)
- Tagger and Beamline Review (November 2008)
GlueX/HallD Reviews in 2007
- Tracking Review (March 6-8, 2007)