Difference between revisions of "Reviews"
From GlueXWiki
Line 4: | Line 4: | ||
== GlueX/HallD Reviews in 2010 == | == GlueX/HallD Reviews in 2010 == | ||
− | * [ | + | * [[Fcal Fabrication Readiness Review]] (Bloomington, XX XX, 2010) |
− | * [[ | + | * [[CDC Fabrication Readiness Review]] (Pittsburg, XX XX, 2010) |
− | + | ||
== GlueX/HallD Reviews in 2009 == | == GlueX/HallD Reviews in 2009 == | ||
− | * [[Nov 3-5, 2009 Calorimetry | Bcal Fabrication Readiness Review | + | * [[Nov 3-5, 2009 Calorimetry | Bcal Fabrication Readiness Review]] (Regina, Nov 3-5, 2009) |
* [http://www.jlab.org/Hall-D/reviews/Tagger_Magnet_Design_Review_July09 Tagger Magnet Review] (July 10, 2009) | * [http://www.jlab.org/Hall-D/reviews/Tagger_Magnet_Design_Review_July09 Tagger Magnet Review] (July 10, 2009) | ||
* [[BCAL Readout Review]] | * [[BCAL Readout Review]] |
Revision as of 11:54, 3 March 2010
Contents
Hall D Review Site
GlueX/HallD Reviews in 2010
- Fcal Fabrication Readiness Review (Bloomington, XX XX, 2010)
- CDC Fabrication Readiness Review (Pittsburg, XX XX, 2010)
GlueX/HallD Reviews in 2009
- Bcal Fabrication Readiness Review (Regina, Nov 3-5, 2009)
- Tagger Magnet Review (July 10, 2009)
- BCAL Readout Review
GlueX/HallD Reviews in 2008
- [FDC Technology Review] (February 1, 2008)
- Calorimeter Review (February 19-20, 2008)
- Drift Chamber and PID Review (March 27-28, 2008)
- Subsystems Review (May 7-9, 2008)
- The Lehman Review (July 2008)
- Tagger and Beamline Review (November 2008)
GlueX/HallD Reviews in 2007
- Tracking Review (March 6-8, 2007)