RunPeriod-2019-11 Validation

From GlueXWiki
Revision as of 23:29, 9 January 2020 by Sdobbs (Talk | contribs) (Calibration/Tuning)

Jump to: navigation, search

Trigger Spreadsheet

December 2019 Run

  • Straight track runs: Starting around 70652, until 70786
  • TOF/CDC HV scans: 70817 - 70828
  • Initial commissioning runs (not everything read out): 70829 - 70834
  • DIRC commissioning runs (no PS): 70835 - 70892
    • Bad TOF HV: 70874 - 70892
    • Lost data: 70850 - 70895
    • TRD/GEM data: 70959 - 70963
  • 2nd round of DIRC commissioning runs (better TOF HV, rocfcal1 restored): 70967-
    • raw mode tests with updated ST firmware: 70995 - 71000
    • production mode with updated ST firmware: 71002 -71206 (?)
    • more firmware fixes on part of the FCAL: 71207 -

2020 Run

Calibration/Tuning

  • Calibration: 71336- [bad PS settings]

Physics Production Runs