Difference between revisions of "RunPeriod-2021-09 Validation"

From GlueXWiki
Jump to: navigation, search
(FCAL)
(Monitoring Team)
Line 1: Line 1:
  
 
== Monitoring Team ==
 
== Monitoring Team ==
 +
 +
Tyler: PS
 +
Igal: FCAL
 +
Drew: CCAL
  
 
== Run list ==
 
== Run list ==

Revision as of 16:47, 2 September 2021

Monitoring Team

Tyler: PS Igal: FCAL Drew: CCAL

Run list

Note on monitoring launches

PS and Tagger Calibration

FCAL

FCAL HV scan:

  • Blue LED 100Hz continuous 15V
    • HV set to 1500V -> 80280
    • HV set to 1550V -> 80284
    • HV set to 1600V -> 80285
    • HV set to 1650V -> 80286
    • HV set to 1700V -> 80287
    • HV set to 1750V -> 80288
    • HV set to 1800V -> 80289
  • Blue LED 100Hz continuous 10V
    • HV set to 1800V -> 80290
    • HV set to 1750V -> 80292
    • HV set to 1700V -> 80293
    • HV set to 1650V -> 80294
    • HV set to 1600V -> 80295
    • HV set to 1550V -> 80296
    • HV set to 1500V -> 80297

CCAL