Difference between revisions of "RunPeriod-2023-01 Validation"

From GlueXWiki
Jump to: navigation, search
(Calibration/Tuning)
(Calibration/Tuning)
Line 5: Line 5:
 
* First day check out: 120169 (raw), 120170
 
* First day check out: 120169 (raw), 120170
 
* First CDC HV scan: 120171-120175
 
* First CDC HV scan: 120171-120175
* More production after ST/BCAL baseline recalibration, new TAGM voltages, bad TAGH crate: 120207-120219
+
* More production after ST/BCAL baseline recalibration, new TAGM voltages, bad TAGH crate: 120207-120222
  
 
== Physics Production Runs ==
 
== Physics Production Runs ==

Revision as of 15:17, 16 January 2023

2020 Run

Calibration/Tuning

  • First day check out: 120169 (raw), 120170
  • First CDC HV scan: 120171-120175
  • More production after ST/BCAL baseline recalibration, new TAGM voltages, bad TAGH crate: 120207-120222

Physics Production Runs