Difference between revisions of "Run Coordination Meetings:Fall2021"

From GlueXWiki
Jump to: navigation, search
Line 111: Line 111:
  
 
==Accelerator status ==
 
==Accelerator status ==
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule (White board)]
+
# [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule (White board)]
#* [https://cebaf.jlab.org/calendar/ Link to accelerator SAD calendar]
+
# [https://cebaf.jlab.org/calendar/ Link to accelerator SAD calendar]
#* Bluejeans code for the daily MCC meetings and Wednesday 1:30 meeting: 569476853
+
# Bluejeans code for the daily MCC meetings and Wednesday 1:30 meeting: 569476853
  
==Hot Checkout ==
 
<span style="color:red">'''To be completed by XXX.'''  </span>
 
* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  ( [https://cebaf.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status (off site test version)])
 
<span style="color:green"> 100% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">0% not ready  </span>
 
 
==Readiness for Summer 2021 Run ==
 
<!--(This section is commented out for clarity) -->
 
*Solenoid (Eugene/Beni)
 
** <strike> Test ramp  </strike>  [https://logbooks.jlab.org/entry/3894808 Complete]
 
** <strike> Start the run without magnetic field </strike>
 
*** [https://logbooks.jlab.org/entry/3896408 Solenoid insulating vacuum]
 
*Surveys (Tim/Mark)
 
** <strike> FCAL survey </strike>
 
** <strike> TOF syrvey </strike>
 
** <strike> Survey beamline component (secondary collimator, etc.) Done except the pipe between the PS and target </strike>
 
** <strike> Survey CCAL after it's installed in the Hall </strike>
 
*DAQ  (Sergei). 
 
** Power the detector, start taking cosmic dat.
 
** [https://logbooks.jlab.org/entry/3896157 RootSpy testing]
 
*Trigger (Alex S.)
 
** <strike> Start checking LED (random) triggers for sub-detectors </strike>
 
** Check physics triggers
 
** Run CCAL trigger when the detector is installed in the Hall
 
*Beam line
 
** <strike> Install He beam pipe between FCAL and CCAL (Tim) </strike>
 
** <strike> Install led shielding wall in front downstream the PS (Tim) </strike>
 
** Radiator status (Tim/Hovanes).
 
***<strike> Checked </strike>
 
** Tagger hodoscope (A. Somov)
 
*** [https://logbooks.jlab.org/entry/3891731 Repair several counters] [https://logbooks.jlab.org/entry/3893093 Repair several counters]
 
*** [https://logbooks.jlab.org/entry/3896308 Install repaired counters] [https://logbooks.jlab.org/entry/3896967]
 
*** [https://logbooks.jlab.org/entry/3896973 TAGH status]
 
**Tagger microscope (Richard Jones/Beni)
 
*** [https://logbooks.jlab.org/entry/3893456 Problems with the control board] [https://logbooks.jlab.org/entry/3893621]
 
*** Calibrate baselines, take dark rate data [https://logbooks.jlab.org/entry/3893161]
 
*** [https://logbooks.jlab.org/entry/3895056 Improve wire management]
 
*** [https://logbooks.jlab.org/entry/3896704 Calibration]
 
*** [https://logbooks.jlab.org/entry/3896728 TAGM scalers]
 
*** [https://logbooks.jlab.org/entry/3896742 Swap cables]
 
**Goniometer (Hovanes).
 
***<strike> Checked </strike>
 
**Collimator Motion (Hovanes)
 
***<strike> Checked </strike>
 
**Active collimator detectors(Richard Jones/Alexandre Deur)
 
*** [https://logbooks.jlab.org/entry/3893156 Check raw signals]
 
***<strike> Checked </strike>
 
**Profiler  (Hovanes)
 
***<strike> Checked </strike>
 
**luminosity monitor (Hovanes)
 
*** <strike> Installed and surveyed </strike>
 
**Halo monitors
 
***They have not been touched. They should be ready. To be checked.
 
**PS system (Alex Somov)
 
*** [https://logbooks.jlab.org/entry/3892089 Check detectors]
 
***<strike> Checked </strike>
 
**Beam line magnets (PS magnet sweeping magnet and tagger quads).
 
*** [https://logbooks.jlab.org/entry/3893487 Tagger magnet NMR]
 
*** [https://logbooks.jlab.org/entry/3893486 Issues with testing PS magnet] [https://logbooks.jlab.org/entry/3893171 Issues with testing PS magnet]
 
**Polarimeter (Sebastian Cole/M. Dugger).
 
*** Optional, not used in PrimEx
 
** Targets (Chris/Tim/Alexandre D.)
 
*** LH4
 
*** Be  http://devweb.acc.jlab.org/CSUEApps/hdlist/task/1973
 
**TAC (Hovanes/Alex Somov)
 
*** [https://logbooks.jlab.org/entry/3894444 Motor changed]
 
*** <strike> Detector checked </strike>
 
*** Use CCAL as TAC, use as a backup
 
**Slow control (Hovanes)
 
**RF (Sergei)
 
*** <strike> [https://logbooks.jlab.org/entry/3891652 Problem with the distribution to the TOF crate] </strike>
 
*** <strike> [https://logbooks.jlab.org/entry/3893263 Fixed] </strike>
 
*** [https://logbooks.jlab.org/entry/3896748 Distribution to the TOF crate]
 
**Radiation monitors (Alexandre D.)
 
*** <strike> Operational </strike>
 
*Detector systems
 
**ST (Mark Ito/Beni)
 
*** Switch on, calibrate baseline, take dark rate data
 
***<strike> Checked </strike>
 
** FDC (Lubomir) 
 
*** Two fadc125 needs to be reoplaced (?)
 
*** Switch on, run cosmic data
 
*** [https://logbooks.jlab.org/entry/3895963 FDC Threshold adjustment]
 
*** [https://logbooks.jlab.org/entry/3895767 FDC status]
 
*** [https://logbooks.jlab.org/entry/3896400 Replaced fadc125]
 
** CDC (Beni) 
 
*** One fadc125 needs to be replaced
 
*** [https://logbooks.jlab.org/entry/3894591 Test with cosmics]
 
*** Initial baseline calibration
 
*** [https://logbooks.jlab.org/entry/3896147 Latest cosmics run]
 
** BCal (Mark D. / Elton)
 
***[https://logbooks.jlab.org/entry/3891991 Occupancy check using LED]
 
***[https://logbooks.jlab.org/entry/3894258 Voltage scan and environment]
 
***[https://logbooks.jlab.org/entry/3894452 Discriminator threshold scan]
 
***<strike> Checked </strike>
 
** FCal (Mark D.)
 
*** Replaced bases [https://logbooks.jlab.org/entry/3894004]
 
*** Status of the base communication software
 
*** [https://logbooks.jlab.org/entry/3891550 Run LED pulser]
 
*** [https://logbooks.jlab.org/entry/3896095 Replace fadc (crate 7, slot 17)]
 
*** [https://logbooks.jlab.org/entry/3896118 Base and PMT replacement][https://logbooks.jlab.org/entry/3896168][https://logbooks.jlab.org/entry/3895099]
 
*** [https://logbooks.jlab.org/entry/3896909 fadc, slot 17, crate 7]
 
*** [https://logbooks.jlab.org/entry/3896429 FCAL status][https://logbooks.jlab.org/entry/3896413]
 
*** [https://logbooks.jlab.org/entry/3896496 HV scan with LED]
 
** ComCal (Alex Somov)
 
*** Installed on the platform, and cabled [https://logbooks.jlab.org/entry/3893089 HV check] [https://logbooks.jlab.org/entr /3892503] [https://logbooks.jlab.org/entry/3893311 Check with LED]
 
*** [https://logbooks.jlab.org/entry/3893309 Replace PMT]
 
*** <strike> Check platform motion </strike>
 
***<strike> Checked </strike>
 
**TOF (Beni / Mark I.) 
 
*** Replaced 4 PMTs
 
*** [https://logbooks.jlab.org/entry/3891446 All channels operational]
 
*** [https://logbooks.jlab.org/entry/3894529 Replace 5 FADCs] [https://logbooks.jlab.org/entry/3894647]
 
*** [https://logbooks.jlab.org/entry/3896591 New INL table in CAEN TDC][https://logbooks.jlab.org/entry/3896689]
 
*** [https://logbooks.jlab.org/entry/3896753 TOF baseline calibration]
 
* RSAD and ESAD Safety documents (Lubomir):
 
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/HallD_ESAD.pdf ESAD]
 
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/COO.pdf COO]
 
** [http://www.jlab.org/Hall-D/detector/fdc/documents/Primex/HallD_ERG.pdf ERG]
 
** Documents approved and ready for shift takers to sign.
 
*Phones
 
**System experts should have found their on-call phones by now.
 
**System experts should have their phone charged.
 
**<font color="red">System experts should start carrying their (charged) phone.</font>
 
*Hall Status/safety (Mark/Tim)
 
*Other topics?
 
  
 
== Live Camera Feeds from the Four Counting Houses ==
 
== Live Camera Feeds from the Four Counting Houses ==

Revision as of 13:50, 1 November 2021

Fall 2021 Run

Meeting General Agenda

Run planning meetings:

Run Planning Meeting Notes, November 7 - September 16, 2021

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/348194990.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 348194990.

3.) To join via phone, use one of the following numbers and the Conference ID: 348194990.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 348194990 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Beam and Hall configuration

  • Beam energy expected:
    • 10.9 GeV
  • Solenoid:
    • 1350 A
  • CW Beam:
    • 250 MHz frequency
    • 50 - 150 nA (production runs), 300 nA maximum (rate scans), < 5 nA during calibration runs
  • Radiators:
    • Goniometer radiators:
      • Diamond JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - Used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020.
    • Amorphous:
      • 10 µm Al (1.86·10-5 R.L.) calibration
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Default running: 5.0 mm.
  • Targets:
    • 4He target: cryogenic target
    • LD target: cryogenic target
    • C target
  • PS converter: 750 μm
  • Miscellaneous:
    • PS test area:
      • Left arm: Check misc. sub-detectors
      • Right arm: Setup to check PbWO4 crystals
    • Other?

General Information

This document describes the run plan for the Hall D Fall 2021 run.

  • Schedule for the run:
  1. November 8: beam restoration
  2. December 6: end of the run


  • Expected Staffing and responsibilities:
    • The Run Coordinator oversees the run:
      • November 3 - November 10: 14 days: Alexander Austregesilo
      • November 10 - November 17: Lubomir Pentchev
      • November 17 - November 24: Simon Taylor
      • November 24 - December 1: Carlos Ayerbe Gayoso
      • December 1 - December 6: Holly Szumila-Vance
    • The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:
      • PDL: Lubomir Penchev
    • Shifts: 2 person shifts: 1 local leader and 1 (optionally remote) worker scheduled through the SRC shift scheduler.
  • Coordination Activities:
    • The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
    • Run meetings: broadcasted on Bluejeans. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.

Runplan

SRC run plan, Fall 2021

Hall D situation room (current run plan)

Hall D counting room white board camera


Accelerator status

  1. Link to accelerator short term schedule (White board)
  2. Link to accelerator SAD calendar
  3. Bluejeans code for the daily MCC meetings and Wednesday 1:30 meeting: 569476853


Live Camera Feeds from the Four Counting Houses

  1. These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.
  2. Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.

Running Shifts Remote